Orange County NC Website
Article 2: Procedures 78 <br /> Section 2.14: Minor Subdivisions <br /> (7) Any plat or portion thereof not receiving final plat approval within the time pernd <br /> // set forth <br /> Ti 1n.,(5) above shall he null and void except under the following nnnditinnc• <br /> (a) The subdivision is built On rlt sections or and a phasing p.�i.�f plan_vvas <br /> approved a art of the Preliminary Plat-, <br /> (b) The period betWeeR the a al .date of thte PrelimiRary Plat ar d the <br /> approgal date of the Final Plat for the first phase doe& note eed o <br /> d <br /> (6) The-periedd betweeR the a gal date of the Final Plat of the first phase <br /> apd the a al date(s) of the Final Plat(s) of aRY su bseq gent phase(&) <br /> does not exceed the time limits specified On the phasing plan of the <br /> Preliminary Plat If no phasing plan is ind cated' then the period between <br /> Final Platapprovals shall not exceed six month& <br /> `8) if a phasing plan for construction of the subdivision i" pp� r�the expiration <br /> date of the Preliminary Plat shall he governed by the time period(s) approved as <br /> part of the phng plan 58 <br /> N as <br /> WM The Planning Director may extend the deadline for recordation provided the <br /> applicant can demonstrate a good faith effort to comply with the deadline, but for <br /> reasons beyond his/her control, fails to meet the requirements for recordation <br /> within the specified period. <br /> tl%J} LAll final plats shall conform to drawing specifications and certification <br /> requirements for Final Plats contained in Section 7.14.3 of this Ordinance. <br /> "(9) Recordation of the approved final plat, and any required auxiliary documentation <br /> shall be with the advice and consent of the Planning Director. <br /> 58 The requirements of(7)and (8)are long-standing errors from the former"Subdivision Regulations"since neither <br /> Preliminary plats nor phasing is applicable to minor subdivisions. Staff suggests correcting this error at this time. <br /> Orange County, North Carolina—Unified Development Ordinance Page 2-54 <br />