Browse
Search
Planning Board - 040721
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2021
>
Planning Board - 040721
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 12:15:11 PM
Creation date
3/29/2021 12:06:19 PM
Metadata
Fields
Template:
BOCC
Date
4/7/2021
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Planning Board minutes - 040721
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 10: Definitions 329 <br /> Section 10.1: Definitions <br /> Meat Processing Facility, Community <br /> A smaller scale facility where livestock or wildlife is slaughtered, processed, and packaged for personal <br /> consumption and/or wholesale or retail sale. The livestock must be raised on the subject farm and from 1 <br /> to 4 other cooperative farm partners. <br /> Meat Processing Facility, Regional <br /> A larger scale facility where livestock is slaughtered, processed, and prepared for distribution for <br /> wholesale or retail sale. <br /> Medical Uses <br /> See"Health Services." <br /> Metal Fabrication Shop <br /> A facility that is engaged in the shaping of metal and similar materials for wholesale or retail sale. <br /> Microbrewery, production only <br /> A facility that produces less than 15,000 barrels per year of craft malt beverages for wholesale or retail <br /> sale and consumption off the premises. Shall be considered a bona fide farming use if located on a farm <br /> and using primarily crops produced on-site. <br /> Microbrewery with Minor Events <br /> A facility that produces less than 15,000 barrels per year of craft malt beverages for consumption on- or <br /> off-site with limited hours for tours of the facility and tastings of the products produced on-site, and small <br /> periodic events that are expected to attract fewer than 150 people to the site. Food services may be <br /> permitted under the conditional gdistrict or special use permit approval. <br /> Microbrewery with Major Events <br /> A facility that produces less than 15,000 barrels per year of craft malt beverages for consumption on- or <br /> off-site with tours of the facility, tastings of the products produced on-site, and periodic events that are <br /> expected to attract more than 150 people to the site. Food services may be permitted under the <br /> conditional zoning district or special use permit approval. <br /> Mobile Home <br /> A dwelling unit that: <br /> a) Is not constructed in accordance with the standards of the North Carolina Uniform Residential <br /> Building for One-and Two-Family Dwellings; <br /> b) Is composed of one or more components, each of which is substantially assembled in a <br /> manufacturing plant and designed to be transported to the home site on its own chassis for <br /> placement on a temporary or semi-permanent foundation when connected to the required utilities, <br /> and includes the plumbing, heating, air conditioning and electrical systems contained therein; and <br /> c) Exceeds eight feet in body width and 32 feet in body length. <br /> d) Is certified by the Secretary of the Department of Housing and Urban Development as meeting <br /> applicable standards. <br /> Mobile home shall also mean a double-wide mobile home and shall be considered synonymous with the <br /> term manufactured home. <br /> Mobile Home, Accessory <br /> A subordinate structure, the use of which is customarily incidental to the permitted use of the principal <br /> buildings. Accessory uses include, but are not limited to: <br /> a) Storage unit, <br /> b) Office, and <br /> c) Classroom facility. <br /> The mobile home, as an accessory structure, must not create non-conforming yards or setbacks. The <br /> installation of a mobile home, as an accessory structure, is exempt from the requirements set forth herein. <br /> Skirting is required, and the mobile home must be connected to the required utilities, which include the <br /> plumbing, heating, air conditioning and electrical systems contained therein, provided the unit is not <br /> Orange County, North Carolina—Unified Development Ordinance Page 10-30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.