Browse
Search
Planning Board - 040721
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2021
>
Planning Board - 040721
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 12:15:11 PM
Creation date
3/29/2021 12:06:19 PM
Metadata
Fields
Template:
BOCC
Date
4/7/2021
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Planning Board minutes - 040721
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5: Uses 252 <br /> Section 5.21: Standards for Miscellaneous Uses <br /> STANDARDS • ' MISCELLANEOUS <br /> 5.22.15.21.1 Major Subdivision <br /> (A) Standards for Class n Special Use Per Conditional Districts <br /> (1) Submittal Requirements <br /> In addition to the information required in Section 2.79, the following shall be <br /> submitted as part of the application: <br /> (a) Net;Treat <br /> Stamped envelopes addressed to each owner of property within 500 foot <br /> of the property proposed for subdivision. The names an�und_addresses f <br /> property owners shall be based on the n urront listing as shown On the <br /> OrangeCountyLand anrJ Records custom 127 <br /> Orange <br /> (b)(a) Development Schedule <br /> A statement, from the applicant, indicating the anticipated development <br /> schedule for the build out of the project. <br /> (c)(b) Water and Wastewater <br /> (i) If the proposed lots are to be served by a public water system, <br /> proof of water supply and service availability in the form of a <br /> certified copy of a resolution to that effect enacted by the <br /> governing body of the water system providing the water to serve <br /> the lots in the subdivision. <br /> (ii) If the proposed lots are to be served by a public sewer system <br /> proof of public sewer service availability in the form of a certified <br /> copy of a resolution to that effect enacted by the governing body <br /> of the sewer system providing the sewer service to the lots in the <br /> subdivision. <br /> (iii) If the proposed lots are to be served by a community water <br /> and/or sewer system, proof that the system(s)will be operated <br /> either directly by or through contract with the water and/or sewer <br /> provider whose service area or interest area it is, as defined in <br /> the Water and Sewer Management Planning and Boundary <br /> Agreement and Map adopted December 3, 2001, and as may be <br /> amended from time to time. <br /> (iv) If the proposed lots are to be served by individual wells or <br /> community wells, a professionally prepared groundwater yield <br /> analysis relating the proposed wells to the U.S. Geological <br /> Survey Water Resources Investigations Report 00-4286 and any <br /> later USGS Water Resource Investigation Report data available. <br /> (v) If the proposed lots are to be served by individual septic systems <br /> the Environmental Health Division shall submit a report indicating <br /> approval for each building lot and for the open space if a <br /> homeowners' association amenity is proposed to be constructed <br /> within the open space. <br /> (d)(c) Open Space Connectivity <br /> A map that demonstrates that the open space composition, accessibility, <br /> shape and size requirements as set forth in Section 7.13 of this <br /> Ordinance are to be met. <br /> 127 Redundant language as Section 2.9 already requires this. <br /> Orange County, North Carolina—Unified Development Ordinance Page 5-131 <br />
The URL can be used to link to this page
Your browser does not support the video tag.