Browse
Search
Planning Board - 040721
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2021
>
Planning Board - 040721
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 12:15:11 PM
Creation date
3/29/2021 12:06:19 PM
Metadata
Fields
Template:
BOCC
Date
4/7/2021
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Planning Board minutes - 040721
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5: Uses 211 <br /> Section 5.10: Standards for Telecommunication Facilities <br /> telecommunication support structure to an extent not commercially <br /> impracticable; and <br /> (b) The placement, height and quantity of wireless telecommunications <br /> towers and equipment in such a manner, including but not limited to the <br /> use of stealth technology or camouflage techniques, to minimize adverse <br /> aesthetic and visual impacts on the land, property, buildings, and other <br /> facilities adjacent to, surrounding, and in generally the same area as the <br /> requested location of such wireless telecommunications support <br /> structure, which shall mean using the least visually and physically <br /> intrusive facility that is not technologically or commercially impracticable <br /> under the facts and circumstances. <br /> (2) Balloon Test and Neighborhood Information Meeting <br /> (a) The applicant shall, at least 45 days prior to a Class-Special Use <br /> Permit pWliGevidentiary hearing or Planning Board meeting �^�"ere <br /> Class o Special Use Per„-,i+at which a Conditional District application is <br /> scheduled for review, conduct a balloon test whereby the applicant shall <br /> arrange to fly, or raise upon a temporary mast, a minimum of 10'Y in <br /> length, brightly colored red or orange balloon at the maximum height of <br /> the proposed new wireless support structure. <br /> (b) The balloon test shall be flown for at least four consecutive daylight <br /> hours starting sometime between 10:00 A.M. and 2:00 P.M. on the dates <br /> chosen. <br /> (c) A notice of the dates (including a second date in case of poor visibility, <br /> weather or atmospheric conditions on the initial date), times, and location <br /> of the balloon test shall be mailed, by certified mail, return receipt <br /> requested, by the applicant, to all persons owning property within 1,000 <br /> feet of the subject parcel no less than 14 days in advance of the first test <br /> date. The data contained within the office of Orange County Land <br /> Records shall be used as the primary source for determining which <br /> residents are to receive notice of the balloon tests. <br /> This notice shall also inform local residents that a neighborhood <br /> information meeting shall be held the day of the balloon test so that the <br /> applicant can explain the proposal and Planning staff, including the <br /> County's telecommunications consultant, can explain the Special Use <br /> Permit releva ,+ review process. <br /> (d) The primary date shall be on a weekend (excluding legal holidays), but to <br /> prevent delays in the processing of the application, and in case of poor <br /> weather or atmospheric conditions on the initial date, the secondary <br /> date may be a weekday. <br /> (e) The applicant shall inform the County Planning Staff, in writing, of the <br /> dates and times of the test at least 14 days in advance. <br /> (f) The applicant shall also post a sign on the subject property, and <br /> directional signs posted at locations to be determined by Planning Staff. <br /> The signs shall measure no more than nine square feet in area and no <br /> less than four square feet in area, giving the contact information of the <br /> County Planning Department, the proposed dates, times, and location of <br /> the balloon test. The signs shall be posted to meet the same time limits <br /> as provided for in the balloon test notification as stated above. <br /> (3) Submittal Requirements <br /> Orange County, North Carolina—Unified Development Ordinance Page 5-85 <br />
The URL can be used to link to this page
Your browser does not support the video tag.