Orange County NC Website
12 <br /> • <br /> Identifying Alternatives to Evaluate <br /> > rrEllatron <br /> � Narrowing the <br /> 106 <br /> All Ideas Field of <br /> 6 0O • <br /> • Meetings • Potential water supply or Apples to apples <br /> • Plans savings comparison across 3 <br /> OWASA Board • Incremental costs pillars of <br /> and others Implementation sustainability <br /> Preliminary Alternatives Analysis <br /> Alternativm <br /> supply <br /> - <br /> AlternatIves <br /> Demand <br /> • Do not meet long-term 9A Zane° <br /> demands 0 1 A ,=per <br /> • Cost-effective strategies I <br /> A 6Ae° <br /> will be considered in <br /> Water Conservation Plan R d 6A <br /> S.S I hliwd MSart•°NC la�ee°5 <br /> as Appendix to LRWSP sA wrote C <br /> 1 �S llAe° <br /> 3` we 1°Ae° <br /> �R[Wel Wa[Q Salsa �0�5[oma lw'[oun[s <br />