Browse
Search
Agenda - 03-16-2021; 8-b - Schools Adequate Public Facilities Ordinance (SAPFO) – Receipt and Transmittal of 2021 Annual Technical Advisory Committee Report
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2021
>
Agenda - 03-16-2021 Virtual Business Meeting
>
Agenda - 03-16-2021; 8-b - Schools Adequate Public Facilities Ordinance (SAPFO) – Receipt and Transmittal of 2021 Annual Technical Advisory Committee Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 3:13:37 PM
Creation date
3/10/2021 3:03:43 PM
Metadata
Fields
Template:
BOCC
Date
3/16/2021
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-b
Document Relationships
Agenda for March 16, 2021 Board Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2021\Agenda - 03-16-2021 Virtual Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 <br /> Chapelbiro Orange County <br /> City Schools Schools <br /> Fiscal Year Number of Students Number of Students <br /> 2017-18 162 617 <br /> 2018-19 155 -7 769 +152 <br /> 2019-20 169 +14 843 +74 <br /> 2020-21 166 -3 885 +42 <br /> Although charter and private schools numbers are not collected for SAPFO purposes, impacts <br /> due to enrollment at these schools are accounted for in SAPFO process with the annual reporting <br /> of student membership and growth rates contained in the 10-year student projections. <br /> Future Residential Development <br /> Proposed growth is not included in the SAPFO projection system until actual students begin <br /> enrollment. The Certificate of Adequate Public Schools (CAPS) test is conducted during the <br /> approval process at a certain stage. Once students are enrolled in a school year, through annual <br /> reporting of student membership numbers, 10-year student projections can be updated to display <br /> future capacity needs in time to efficiently plan for future school capacity/construction requests. <br /> The SAPFOTAC continue to monitor and evaluate the demand and growth of residential <br /> development throughout Orange County as well as its effect on student membership rates. Below <br /> is a list of larger residential projects and the potential number of students from these projects <br /> which may have an impact in the short term. Please note, the City of Mebane is not a party to the <br /> SAPFO agreement and therefore does not require that CAPS (Certificate of Adequate Public <br /> Schools)be issued prior to development approvals. As a result, the expected number of students <br /> is based on unit type and bedroom count estimates. <br /> Residential Project Jurisdiction Proposed Total Expected Number of <br /> Units Students <br /> Elementary: 84 <br /> Collins Ridge Phase 1 Hillsborough 672 Middle: 45 <br /> High: 57 <br /> Elementary: 44 <br /> Weavers Grove Chapel Hill 235 Middle: 18 <br /> High: 20 <br /> Elementary: 60 <br /> The Meadows Mebane 256 Middle: 31 <br /> High: 34 <br /> Elementary: 9 <br /> Stagecoach Corner Mebane 35 Middle: 5 <br /> High: 6 <br /> Bowman Village/Bowman Elementary: 48 <br /> Place Mebane 177 Middle: 23 <br /> High: 30 <br /> The Townes of Oakwood Elementary: 5 <br /> Square Mebane 88 Middle: 4 <br /> High: 5 <br /> Northeast Village Elementary: 46 <br /> (Havenstone Phase 1 & 2) Mebane 169 Middle: 22 <br /> High: 29 <br /> vi <br />
The URL can be used to link to this page
Your browser does not support the video tag.