Browse
Search
Agenda - 03-16-2021; 8-a - Minutes
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2021
>
Agenda - 03-16-2021 Virtual Business Meeting
>
Agenda - 03-16-2021; 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 3:19:16 PM
Creation date
3/10/2021 3:03:06 PM
Metadata
Fields
Template:
BOCC
Date
3/16/2021
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-a
Document Relationships
Agenda for March 16, 2021 Board Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2021\Agenda - 03-16-2021 Virtual Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
22 <br /> 1 jurisdictions funded the planning study to help inform future land use and potential utility service <br /> 2 that could be mutually beneficial. <br /> 3 <br /> 4 Orange County utilized funds available in the FY 2019-2020 budget to reimburse the City of <br /> 5 Mebane for half of the consulting expenses of the Buckhorn Area Plan. The original goals have <br /> 6 been to work together with a consultant to further analyze areas within Orange County— <br /> 7 adjacent to and near Mebane — and to develop recommendations for a growth strategy. In <br /> 8 January 2020, Piedmont Triad Regional Council (PTRC) was selected as the consultant, and <br /> 9 beginning on February 6, 2020, Orange County, Mebane, and PTRC have met monthly to <br /> 10 discuss the geographic area of the study, the parcel development suitability criteria and <br /> 11 mechanisms for feedback on the analysis. <br /> 12 <br /> 13 During the course of the study, there have been developments in Orange County brought to <br /> 14 Mebane with a focus to rezone and to annex into Mebane. Any development proposals that are <br /> 15 in Orange County and that fall within the study area have been noted as such in Orange County <br /> 16 Planning's feedback to Mebane during the informal courtesy review process. While Mebane has <br /> 17 the ability to annex properties that are willing to be annexed pursuant to state law without <br /> 18 County `approval', Orange County Planning Staff's review of proposals has included language <br /> 19 that informally recommends Mebane delay any further development of parcels that fall within the <br /> 20 Buckhorn Area (but outside the existing utility service agreement) until the Plan is finalized and <br /> 21 has been shared with the public and elected officials. <br /> 22 <br /> 23 The BOCC received an Information Item on the Buckhorn Area Plan in its December 15, 2020 <br /> 24 agenda packet. <br /> 25 <br /> 26 THE BUCKHORN AREA PLAN (STUDY): <br /> 27 Staff will provide an overview of the Buckhorn Area Plan, which functions as a technical study, <br /> 28 at the BOCC meeting. Some key aspects are provided as attachments herein. A copy of the <br /> 29 full document can be downloaded via the following link: <br /> 30 https://www.ptrc.org/Home/ShowDocument?id=l0489 <br /> 31 <br /> 32 The study uses GIS mapping to determine parcels most suitable for development within the <br /> 33 focus area. The process allows for a technical review of multiple development factors including: <br /> 34 developable acres, preservation areas, mean slope, watershed, sewer infrastructure, water <br /> 35 infrastructure, interstate access, interstate visibility, roadway access, and access to existing rail. <br /> 36 In addition to the parcel-level scoring based on objective suitability criteria, there are a few <br /> 37 areas of clustered parcels that have been recommended for long-term growth based on a <br /> 38 combination of final score and high economic development use potential. <br /> 39 <br /> 40 The focus area (Attachment 1) for this study was defined after significant consideration of <br /> 41 existing land uses, environmental impacts, and economic development potential. This does not <br /> 42 mean that all areas in the study are proposed for potential change but just an area/base <br /> 43 element of research. The boundaries for the focus area are the rail line to the North; Ben Wilson <br /> 44 and Mattress Factory Roads to the west, Mt. Willing Road and parcels along the 1-85 connector <br /> 45 to the East; Bushy Cook Road and Seven Mile Creek to the South. The City of Mebane and <br /> 46 Orange County Planning, Administrative, Public Works, and Economic Development staffs <br /> 47 worked with the Piedmont Triad Regional Council to ensure parcels with the highest potential <br /> 48 were included in the analysis. It is worth noting, however, that parcels with significant public <br /> 49 utility (schools, churches, cemeteries) were marked as not available for development, <br /> 50 regardless of how well they scored on the parcel suitability criteria. <br /> 51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.