Orange County NC Website
DocuSign Envelope ID:C8D4FB88-B3C0-4727-B87A-F40BF32228BB <br /> smithsinnett <br /> ARCHITECTURE <br /> July 9, 2020 <br /> Orange County <br /> 300 West Tryon Street <br /> Building B, Yd Floor Office 10 <br /> Hillsborough, North Carolina 27278 <br /> Attn.: Ms. Angel Barnes <br /> Capital Projects Manager, Asset Management Services <br /> Dear Ms. Barnes: <br /> FEE PROPOSAL: Southern Human Services Complex Roof and HVAC Replacement <br /> Smith Sinnett Architecture greatly appreciates the opportunity to provide Orange County with a <br /> proposal for Architectural Design & Engineering Services for the Southern Human Services Roof and <br /> HVAC replacement project, located at 2501 Homestead Road, Chapel Hill, North Carolina. <br /> SCOPE OF WORK: <br /> The Southern Human Services Complex is an approximately 27,080 square foot building. The existing <br /> roof, insulation, curbs, HVAC units and miscellaneous items are to be replaced.The new roof is to be <br /> PVC and has an initial probable cost estimate provided by CFE of $ 318,190 (not including <br /> contingency). The HVAC replacement probable cost estimate is $700,000. The HVAC replacement <br /> includes the replacement of two RTUs, boilers, vav's and DDC controls with a Seimens system. <br /> SCHEMATIC DESIGN/DESIGN DEVELOPMENT: <br /> Smith Sinnett Architecture will work with and coordinate all members of the design team to evaluate <br /> the owner's requests and begin developing an approach to design and construction of the proposed <br /> improvements. Initially,we expect to meet with Orange County's Planning Department to assess and <br /> meet all requirements for approvals, if necessary. During the schematic design/design development <br /> phase we would anticipate attending meetings with the owner to present design progress and collect <br /> owner feedback. We assume the County will supply conformed A/E construction documentation and <br /> that these drawings are accurate. <br /> CONSTRUCTION DOCUMENTS: <br /> The construction documents shall be based on approved schematic design/design development <br /> documentation and shall set forth in detail the requirements for construction of the project. These <br /> documents may include, but not be limited to, roof plans, reflected ceiling plans, framing plans, PME <br /> 4600 Lake Boone Trail, Suite 205 I Raleigh, NC 27607 1 919.781.8S82 I HUB Certified I www.smithsinnett.com <br />