Browse
Search
2020-898-E AMS - Smith Sinnett SHSC roof design
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-898-E AMS - Smith Sinnett SHSC roof design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 4:42:31 PM
Creation date
3/1/2021 4:20:15 PM
Metadata
Fields
Template:
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:C8D4FB88-B3C0-4727-B87A-F40BF32228BB <br /> Item on Form Definition <br /> Attach basis and justification for estimate. Include description,quantities, units, <br /> CURRENT ESTIMATED CONSTRUCTION COST special features,similar cost on recent projects,etc. <br /> A. 1. Demolition Includes but may not be limited to lead or asbestos testing and removal, building or <br /> interior space demolition in whole or part. <br /> A.2.Site Work Includes but may not be limited to grading,excavating,poor soils or rock removal, <br /> utilities relocation, roads,walks, parking,streambank repairs,stormwater <br /> management, retaining walls, rainwater harvesting systems, landscaping. <br /> Attach explanation of any special building, mechanical,or electrical service <br /> B. 1. Utility Services requirements with appropriate distance to existing buildings,water,gas,electrical or <br /> other utility service. <br /> B.9. Associated Construction Costs Includes but may not be limited to construction fire alarm testing,utility shut downs, <br /> utilities,signage, security,displaced parking,staging, lock cores,keys, permits. <br /> B. 10. Other List other signficant sources of cost not included elsewhere. Additional lines may be <br /> added if needed. <br /> PRECONSTRUCTION Includes but may not be limited to land surveys, lead/asbestos surveys, <br /> COSTS environmental assessments,copying, postage,costs of print advertising,and <br /> destructive testing. For CM at Risk,preconstruction costs are consistent with the <br /> requirements of the preconstruction services agreement. <br /> CONTINGENCIES Unanticipated or unforseen conditions including but not limited to design error and <br /> omissions,concealed site conditions,utility conflicts,and extended overhead <br /> resulting from weather or other delay. <br /> 21 <br /> Revised 07/20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.