Browse
Search
2020-898-E AMS - Smith Sinnett SHSC roof design
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-898-E AMS - Smith Sinnett SHSC roof design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 4:42:31 PM
Creation date
3/1/2021 4:20:15 PM
Metadata
Fields
Template:
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:C8D4FB88-B3C0-4727-B87A-F40BF32228BB <br /> Attachment C - Format of Total Project Cost Estimate <br /> ORANGE COUNTY <br /> Attachment C---Project Cost Estimate <br /> PROJECT <br /> IDENTIFICATION: <br /> PROJECT CITY or LOCATION: <br /> (Definitions/explanations are provided on pg 2 to assist in completion of this <br /> form.) <br /> CURRENT ESTIMATED CONSTRUCTION COSTS QTY UNIT COST PER UNIT TOTAL <br /> A. Site Preparation <br /> 1. Demolition $0 <br /> 2. Site Work $0 <br /> B. Construction <br /> 1. Utility Services $0 <br /> 2. Building Construction(new space) $0 <br /> 3. Building Construction(existing) $0 <br /> 4. Plumbing(new space) $0 <br /> 5. HVAC(new space) $0 <br /> 6. Electrical(Includes TV&Radio Studio) $0 <br /> 7. Fire Supression and Alarm Systems $0 <br /> 8. Telephone, Data,Video $0 <br /> 9. Associated Construction Costs $0 <br /> 10. Other: $0 <br /> C. Equipment <br /> 1. Fixed $0 <br /> 2. Moveable $0 <br /> ESTIMATED CONSTRUCTION COSTS $0 <br /> Items below may be calculated by percentage or lump sum. If using lump sum,make entry in$field. <br /> DESIGN FEE % (%of Estimated Construction Costs) $0 <br /> PRECONSTRUCTION <br /> COSTS % (%of Estimated Construction Costs) $0 <br /> CONTINGENCIES % (%of Estimated Construction Costs) $0 <br /> ESTIMATED COSTS (%of Estimated Construction Costs+Contingencies+Design Fee) $0 <br /> Escalation=percent per month multiplied by number of months <br /> (From Est.Date to mid-point of construction)= months %per month <br /> ESCALATION COST INCREASE (Total of Estimated Costs x Escalation%) $0 <br /> ESTIMATED TOTAL PROJECT COSTS (Estimated Costs+Escalation Cost Increase if any) $0 <br /> APPROVED BY: TITLE DATE <br /> DEFINITIONS <br /> 20 <br /> Revised 07/20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.