Browse
Search
Planning Board - 030321 ORC Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Ordinance Review Committee
>
Agendas
>
2021
>
Planning Board - 030321 ORC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2021 3:21:43 PM
Creation date
2/26/2021 2:46:51 PM
Metadata
Fields
Template:
BOCC
Date
3/3/2021
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Ordinance Review Committee notes - 030321
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Ordinance Review Committee\Minutes\2021
Planning Board - 030321 ORC Agenda Packet - Replacement Att 1 - 160D
(Attachment)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Ordinance Review Committee\Agendas\2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
257 <br /> Article 6: Development Standards <br /> Section 6.2:Lot&Building Standards <br /> 6.2.5 Principal Uses <br /> There shall be no more than one principal use on any zoning lot except where: <br /> (A) Permitted as a CU District or CZConditional-District;or <br /> (B) The parcel is located within an Economic Development District,Commercial Transition <br /> Activity Node, Commercial-Industrial Transition Activity Node, Rural Neighborhood <br /> Activity Node,or Rural Community Activity Node,as designated by the Comprehensive <br /> Plan;or <br /> (C) The parcel is less than 2 acres in size,and non-residential multiple uses are proposed <br /> within a single principal structure;or <br /> (D) One of the uses is an unstaffed telecommunications tower subject to a year-to-year or <br /> other short term lease;or <br /> (E) The use(s)is/ore marker-yioth Ain the Table of Permitted I Ices(Cention G 7 1)aR <br /> s/are located on a bona fide The use is allewedlocated on a bona fide farm,and <br /> is in accordance with the use-specific standards in Article 5 which allow for more than <br /> one principal use in such cases.' <br /> 6.2.6 Principal Structures <br /> (A) Residential <br /> (1) There shall be no more than one principal structure permitted on any residential <br /> zoning lot,with the exception of the following: <br /> (a) Multi-family developments which have received approval as a SIB Dlstrint <br /> eKS7Conditional District,or <br /> (b) Temporary use of mobile homes for custodial care approved in <br /> accordance with the provisions of Section 5.4.4(B),or <br /> (c) During the installation or construction of a permanent unit on the same <br /> lot,as provided in Section 5.4.4 of this Ordinance,or <br /> (d) Duplexes,on lots that have twice the required lot area of the zoning <br /> district. <br /> (B) Non-Residential <br /> (1) There shall be no more than one principal structure permitted by right on any <br /> non-residential zoning lot greater than two acres in size,unless: <br /> (a) Permitted as a G I nistri..t or r-'Conditional District,or <br /> (b) The zoning lot is located within an Economic Development District, <br /> Commercial Transition Activity Node,Commercial-Industrial Transition <br /> Activity Node, Rural Neighborhood Activity Node,or Rural Community <br /> Activity Node,as designated by the Comprehensive Plan;or <br /> (c) The stF61GtYre/s\is/ore loroted A_.n A heno fide form And is/ore utilizer!for <br /> se(s)that is/ore.Worker',.dth Ain the Table of Permitted Uses(Section <br /> The use is allewedlocated on a bona fide farm,and is in <br /> accordance with the use-specific standards in Article 5 which allow for <br /> more than one principal use in such cases.- <br /> 139 When the table of permitted uses was updated in 2019,the way these uses were handled in Article 5 was <br /> changed. This subsection should have been revised in 2019 but was not. <br /> 140 When the table of permitted uses was updated in 2019,the way these uses were handled in Article 5 was <br /> changed. This subsection should have been revised in 2019 but was not. <br /> Orange County,North Carolina—Unified Development Ordinance Page 6-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.