Orange County NC Website
219 <br /> Article 5: Uses <br /> Section 5.11:Standards for Waste Management Facilities <br /> (iii) Complete description of operation,including source of materials, <br /> method of compaction,type of sealing proposed,types and <br /> number of equipment to be used. <br /> (iv) Any phasing of operations and relationship among phases. <br /> (v) Operating practices to be followed to ensure compliance with <br /> applicable performance standards in Section 2-.7-7�E+6.4.121 <br /> (g) A Rehabilitation Plan which shall include: <br /> (i) A statement of planned future use of the site,including detailed <br /> methods of accomplishment. <br /> (ii) A map,to the same scale as the Site Plan,showing final <br /> proposed topography,landscaping and ground cover proposed <br /> and any drainage or other structures proposed. <br /> (iii) A phased plan of rehabilitation, related to the operations plan, <br /> showing how the rehabilitation will relate to the fill operations and <br /> the date of final completion. <br /> (2) Standards of Evaluation <br /> (a) All operations associated with the fill shall conform to the following <br /> performance standards: <br /> (i) Direct illumination resulting from the operation shall not fall upon <br /> any land not covered by the application. <br /> (ii) Equivalent sound levels at the boundaries of the fill site shall not <br /> exceed the following standards: <br /> DECIBELTABLE 5.11.2.A.2.1:SOUND LEVEL STANDARDS FOR WASTE MANAGEMENT <br /> FACILITIES <br /> TiME 7:00 a.m.to 7:00 p.m. 68 dBA <br /> 7:00 p.m.to 7:00 a.m. 58 dBA <br /> (iii) Vibration levels at the boundaries of the fill site shall not exceed <br /> the following standards: <br /> TABLE 5.11.2.A.2.11:VIBRATION LEVEL STANDARDS <br /> MANAGEMENT FACILITIES <br /> TiME DECIBEL LIMIT <br /> Steady State 1.0 inches/second <br /> Impact 2.0 inches/second <br /> [11 The maximum particle velocity shall be the maximum displacement sums of <br /> three mutually perpendicular components,recorded simultaneously, <br /> multiplied by the frequency in cycles per second. <br /> For purposes of this Ordinance,steady state vibrations are vibrations which are <br /> continuous,or vibrations in discrete impulses more frequent than 60 per minute. <br /> Discrete impulses which do not exceed 60 per minute,shall be considered <br /> impact vibrations. <br /> 121 Update to correct section reference. <br /> Orange County,North Carolina—Unified Development Ordinance Page 5-100 <br />