Orange County NC Website
DocuSign Envelope ID:ODC20FEA-61BA-4E8D-BB15-F tJ( HIT A <br /> 1 �m AIADocument G802 - 2017 <br /> Amendment to the Professional Services Agreement <br /> PROJECT: (name and address) AGREEMENT INFORMATION: AMENDMENT INFORMATION: <br /> Orange County North Carolina New Date:August 24,2015 Amendment Number:006 <br /> Detention Center <br /> Date:September 29,2020 <br /> OWNER:(name and address) ARCHITECT:(name and address) <br /> Orange County,North Carolina Moseley Architects P.C. <br /> 200 S.Cameron Street 11430 North Community House <br /> Hillsborough,North Carolina Road <br /> 27278 Suite 225 <br /> Charlotte,North Carolina <br /> 28277 <br /> The Owner and Architect amend the Agreement as follows: <br /> Additional Services to provide civil engineering for property drainage improvements and services for the Transition Planning. <br /> Services shall be as follows: <br /> Holloway Property Ditch <br /> 1.Design,Town Coordination,and Plan Production: <br /> a.Provide Layout and design as needed for Town coordination. <br /> b.Attend Town meetings to receive any comments and discuss Project. <br /> c.Provide plan changes as needed for Town. <br /> 2.NCDOT Coordination and Approvals: <br /> a.Meet with NCDOT staff as needed to understand project requirements for studies,review process,and any roadway <br /> improvements. <br /> b. Provide engineeering design for right-of-way improvements. <br /> c. Submit design to NCDOT(district office)and make necessary plan revisions for approvals. <br /> 3.Construction Phase: <br /> ..a.Provide construction review services,answer contractor RFIs,review change requests,provide regular site visits for review <br /> of work(maximum of three),and provide pre-final and final site inspections <br /> 4.Budget for Miscellaneous Expenses: <br /> ..a.Mileage,printing,express mailings,etc <br /> 5.Transition Planning Services: <br /> a.Organize transition and occupancy team. <br /> ..b.Monthly transition meetings during final phases of construction. <br /> c.Develop/review staffing and hiring phase plan. <br /> d.Prepare a personnel activation schedule. <br /> e.Review and assist with scenario,and post order development. <br /> f.Develop and conduct pre-occupancy training efforts. <br /> g.Identify Pre-occupancy logistics plan. <br /> h.Review/develop the detention classification plan. <br /> i.Coordinate facility shakedown. <br /> j.Develop PREA and detention policy and procedures manual,and inmate handbook. <br /> k.Conduct post-occupancy evaluation/risk assessment. <br /> 1.Provide Operational FF&E identification and obtain bids for such to be submitted to the county for purchase. <br /> in.New Facility Operation training. <br /> n. Policy&Procedure/PREA training. <br /> AIA Document G802-—2017.Copyright @ 2000,2007 and 2017 by The American Institute of Architects.All rights reserved.The"American Institute of <br /> Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are registered trademarks and may not be used without permission.This document was <br /> produced by AIA software at 08:48:21 ET on 09/29/2020 under Order No.6822004161 which expires on 01/10/2021,is not for resale,is licensed for one-time use <br /> only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail copyright@aia.org. <br /> User Notes: (369ADA50) <br />