Browse
Search
2020-904-E AMS - Summit Engineering and Design Northern Campus amendment
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-904-E AMS - Summit Engineering and Design Northern Campus amendment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 5:27:27 PM
Creation date
2/25/2021 4:44:52 PM
Metadata
Fields
Template:
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:27028AA0-327E-4DEF-B3D5-A4F12D5863EC <br /> Angel Barnes <br /> From: Angel Barnes <br /> Sent: Monday, October 05, 2020 11:02 AM <br /> To: Steven Arndt <br /> Subject: FW: CMT/SI Detention Center <br /> Attachments: Attachment D - Bordeaux Bid Basis Schedule dated 9-17-2019.pdf <br /> Steve, <br /> Per our conversation here is what is remaining on the Northern Campus. <br /> Thank You, <br /> Angef <br /> Angel Barnes I Capital Projects Manager I Orange County Asset Management Services 300 West Tryon Street I Bldg B 3rd Floor <br /> Office 10 1 Hillsborough, NC 27278 1 (919) 245.2628 (direct) 1 (919)610.8182 (mobile) www.orangecountync.gov <br /> ONE COUNTY <br /> NOIUFFi C.'ARC)LINA <br /> CONFIDENTIALITY NOTICE: All email messages,including any attachments,generated from or received by this account are the property of <br /> Orange County Government and as such are considered public domain and are subject to the North Carolina Public Records <br /> Law. Certain confidential information may be transmitted and any unauthorized review,use,disclosure or distribution is prohibited. If you <br /> are not the intended recipient,please contact the sender by reply email and destroy all copies of the original message. <br /> From: Jeff Elliott, PE [mailto:jeff.elliott@summitde.net] <br /> Sent: Monday, October 05, 2020 11:00 AM <br /> To: Don Dewey, PE <br /> Cc: Angel Barnes <br /> Subject: [EXTERNAL MAIL!] RE: CMT/SI Detention Center <br /> Yes absolutely! So here is a quick rundown of what I understand per conversations with Bordeaux and our onsite <br /> inspector: <br /> Prolonged Construction Schedule: <br /> • Please note we are required to be onsite when structural work is ongoing, per building code. <br /> • Our time onsite is totally controlled by contractor's schedule; therefore, if they are working at a pace slower <br /> than the base schedule (see attached) then we have to be onsite for that additional time. <br /> o For one example, item "STR 205 Structural Masonry Walls".The late finish for this activity was suppose <br /> to be June 17t", 2020... so that is when we anticipated no longer needing to perform masonry <br /> inspections and testing. In realty,the structural masonry is still not finished as of middle of last week, so <br /> clearly that has required additional onsite hours not anticipated, per GC schedule in our original <br /> proposal. <br /> o "STR 220 Set Roof Joists—Detention Areas" and "STR 225 Roof Metal Decking—Detention Areas"were <br /> supposed to be completed July 151", 2020 and August 121", 2020, respectively.These items are still not <br /> completed. <br /> Work remaining: <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.