Browse
Search
2020-904-E AMS - Summit Engineering and Design Northern Campus amendment
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-904-E AMS - Summit Engineering and Design Northern Campus amendment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 5:27:27 PM
Creation date
2/25/2021 4:44:52 PM
Metadata
Fields
Template:
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:27028AA0-327E-4DEF-B3D5-A4F12D5863EC <br /> NORTH CAROLINA <br /> CONTRACT AMENDMENT <br /> ORANGE COUNTY <br /> THIS CONTRACT AMENDMENT("Amendment")is made and entered into this I Ith day of November, 2020 by and <br /> between ORANGE COUNTY (hereinafter referred to as "County") and SUMMIT DESIGN AND ENGINEERING <br /> SERVICES,PLLC (hereinafter referred to as"Consultant"). <br /> WITNESSETH: <br /> THAT WHEREAS,the County and Consultant entered into a contract dated October 18, 2019, (hereinafter the"Original <br /> Agreement"), for the provision of professional services for Northern Campus Expansion- Construction Materials <br /> Testing(CMT) and Special Inspections(SI) Services; and <br /> WHEREAS, the County and Consultant desire to amend the Original Agreement while keeping in effect all terms and <br /> conditions of the Original Agreement not inconsistent with the terms and conditions set forth below. <br /> NOW THEREFORE, for and in consideration of the mutual covenants and agreements made herein, the parties agree to <br /> amend the Original Agreement as follows: <br /> 1. In order to ensure the completion of the Services identified in the term of the Original Agreement is amended <br /> to reflect an end date by which all Services shall be completed as of July 1,2021. <br /> 2. Exhibit 1 to the Original Agreement is amended by adding the following tasks and services to the Services to <br /> be provided by the Consultant: Complete remaining special testing and construction materials testing for the <br /> Northern Campus project. <br /> 3. Article 5, Section 5.1.1 is amended to reflect a maximum payable not-to-exceed amount of Two Hundred <br /> Sixty-Five Thousand,Two Hundred Thirty-Eight Dollars ($265,238.00). <br /> 4. Except for the changes made herein,the Original Agreement shall remain in full force and effect to the extent <br /> it is not inconsistent with this Amendment. In the event that there is a conflict between the Original <br /> Agreement and this Amendment,this Amendment shall control. <br /> IN TESTIMONY WHEREOF, this Amendment has been executed by the parties hereto, as of the date first above <br /> written. <br /> ORANGE COUNTY <br /> C0 Sig—by: 1 11/15/2020 �° tley_ 11/12/2020 <br /> flbUAnA! C AtMM�VYIRA1 M 1� <br /> Bonnie Hammersley Troy Dover <br /> County Manager President <br />
The URL can be used to link to this page
Your browser does not support the video tag.