Orange County NC Website
9 <br /> ALTERNATES <br /> ALTS Use MassTimber(CLT)for building only KO post $1,009,540 $1,009,540 <br /> tension--parking deck mmains❑P pot tension <br /> ALT2 Option to use steel for building l€O post tension $471,119 $471,119 <br /> ALT 3 Option to ad efectrochtomic glass at west£made on $226,684 $226,684 Manual shades in base bid;maintain as alternate <br /> levels 2/3 curtainwall <br /> ALT 4 Optipon to use motomzid shades ILO M--wd $147,826 $147,825 Manual shadesin base bid;maintain as alternate <br /> ALTERNATE55UBTOTAL $1.855,169 $374510 $1,480,659 $0 $0 <br /> TOTAL DEDUCTS ($4,832,784) ($490,835) ($2,754,156( ($1,137,793) ($2,827,316) <br /> TOTAL ADDS $1,907,112 $374,510 $1,480,659 $51,943 $51,943 <br /> [TOTAL ($2,925,6721 ($116,325( ($1,273,4971 ($1,085,8501 ($2,775,373)l <br />