Orange County NC Website
Attachment 1 - Schematic Design Estimate <br /> SD Estimate Variance 7 <br /> ■ BARINHILL November 11, 2020 <br /> CONTRACTING The 203 Project <br /> COMPANY Carrboro, NC <br /> TOTAL COSTS <br /> Barnhill Bree Delta to Previous <br /> Division 1: General Work - $ 1,082,067 $ 1,050,000.00 $ (32,067) <br /> Division 3: Concrete $ 5,541,323 $ 5,576,030 $ 34,707 <br /> Division4:Masonry $ -1,257,050 $ 1,283,803 $ 26,753 <br /> Division 5:Steel $ 447,325 $ 423,549 $ (23,776) <br /> Division 6:Wood&Plastics $ 248,240 $ 191,339 $ (56,901) <br /> Division 7:Thermal&Moisture $ 1,241,655 $ 1,032,687 $ (208,968) <br /> Division 8:Doors&Glass $ 1,712,425 $ 1,632,365 $ (80,060) <br /> Division 9: Finishes W $ 1,766,474 $ 1,727,426 $ (39,048) <br /> Division 10:Specialties $ 148,655 $ 95,073 $ (53,582) <br /> Division 11:Equipment $ 35,400 $ 35,000 $ (400) <br /> Division 12:Furnishings $ 56,280 $ 20,000 $ (36,280) <br /> Division 14:Conveying Systems $ 400,000 $ 465,000 $ 65,000 <br /> Division 21:Fire Suppression $ 320,006 $ 337,422 $ 17,416 <br /> Division 22:Plumbing $ 275,500 $ 309,738 $ 34,238 <br /> Division 23:Heating,Ventilating,Air Conditioning $ 1,919,148 $ 1,948,383 $ 29,235 <br /> Division 26:Electrical $ 2,982,219 $ 2,902,216 $ (80,003) <br /> Division 31:Earthwork $ 363,633 $ 467,974 $ 104,341 <br /> Division 32:Exterior Improvements $ 195,577 $ 445,283 $ 249,707 <br /> Division 33:Site Utilities $ 36,201 $ - - 137,880 $ 101,680 <br /> SUBTOTAL TRADE PACKAGES $ 20,029,177 $ 26,081,169 $ 51,992 <br /> SUBGUARD BONDING $ 280,408 $ 240,974 $ (39,434) <br /> SUBTOTAL COST OF WORK $ 20,309,585 $ 20,322,143 $ 12,558 <br /> CONSTRUCTION CONTINGENCY $ 406,192 $ 406,443 $ 251 <br /> DESIGN/ESTIMATE CONTINGENCY $ 11015,479 $ 1,016,107 $ 628 <br /> ESCALATION $ 1,015,479 $ 1,016,107 $ 628 <br /> SUBTOTAL $ 22,746,735 $ 22,760,799 $ 14,064 <br /> CMAR GENERAL CONDITIONS $ 700,000 $ 682,824 $ (17,176) <br /> CMAR INSURANCES $ 495,003 $ 261,749 $ (233,254) <br /> BONDS $_ - $ 191,191 $ 191,191 <br /> CM FEE 11 $ 932,795 $ 853,530 1 $ (79,265) <br /> TOTAL $ 24,874,533 1 $ 24,750,094 1 $ (124,439) <br /> Building Gross Area 131,696 sgft $ 131,696 $ - <br />