Orange County NC Website
Attachment 3- Construction Cost Allocation Matrix 10 <br /> THE 203 SCHEMATIC DESIGN CONSTRUCTION COST ALLOCATION MATRIX <br /> 112112021 <br /> Town WCOM County Shared Bldg Site Site Parking <br /> Percent of Space 42.62% 1.76% 55.62% <br /> #of cars 56 3 111 3 <br /> Cars In Excess of LUO <br /> portion of shared parking 1.28 0.05 1.67 <br /> Shared Costs 11,212,039 1,290,170 6,257,58 <br /> Dedicated 2,340,455 143,028 2,555,097 <br /> Shared 4,778,571 197,332 6,236,136 <br /> Site 549,870 22,707 717,593 <br /> Parking 2,071,824 110,423 4,075,335 <br /> TOTAL CONSTRUCTION COST* $9,740,720 $473,490 $13,584,160 <br /> of Base Cost 40.93% 1.99% 57.08% <br /> BUDGETS $10,505,000 inc w/Town $11,777,00 <br /> delta-(over)/under $290,790 {$1,807,160) <br /> BUDGET%ASSUMPTIONS 44% inc w/Town 56% <br /> 1.08% -1.OS% <br /> NOTES: <br /> Construction Costs The construction costs are for all base construction costs.This does not include furniture,AV <br /> equipment,specialized performance space seating and equipment,IT fiber,parking management <br /> system,rooftop photo voltaic panels,land acquisition,and soft casts.Construction costs include <br /> just over$1M in accepted value engineering(VE)options. <br /> Dedicated:The construction costs associated with the building out of dedicated tenant areas. <br /> Shared:The construction costs associated with shared areas of the builing.This includes structure,building <br /> envelope,central utilities,stairs,elevators,risers,common lobby,cirtulation spaces,etc.Shared <br /> costs are allocated to tenants on a prorated basis based on percentage of net area in the building. <br /> Site:The construction costs associated with site including street utilities,hardscape,landscape,site <br /> lighting lighting,etc.Shared costs are allocated to tenants on a prorated basis based on percentage <br /> of net area in the building. <br /> Parking:The construction costs associated with the parking structure allocated on the spaces required by <br /> each tenant.The costs of shared parking spaces are allocated to tenants on a prorated basis based <br /> on percentage of net area in the building.Spaces above and beyond the LUO required parking <br /> spaces is allocated to the Town of Carrboro as a Town decision to include the additional parking. <br /> Subject to Change As the design progresses and plans are modified,there may be small adjustments to the percent of <br /> net space allocated to each tenant. <br /> Owners'Budgets Owners's budgets are per the"Option 1-budget Allocation with Skills Development"table provided <br /> by Orange County.There is a$1.114M owner's contingency that is not included in the above noted <br /> budgets. <br />