Orange County NC Website
DocuSign Envelope ID:CA518426-7674-44D9-B125-E4C45FD169AE <br /> ECS SOUTHEAST, LLP <br /> Task 2-Air Monitoring/Air Clearance Samples(daily/unit rate) <br /> Air Monitoring* (estimated $600/day for five days)......................................................................$3,000.00 <br /> PCMAir Samples............................................................................................................................ No Charge <br /> TEM Air Samples (based on 24 hour turnaround—Estimated 10 samples @ $75/sample)* ...........$750.00 <br /> Budget Task 2...........................................................$3,750.00 <br /> *The total cost for air monitoring cannot be determined until the asbestos abatement scope of work is <br /> written and the schedule is determined. We can provide a more detailed estimate when the project is <br /> designed and abatement contractor's schedule has been determined. Based on the quantity of VCT and <br /> associated mastic and re-occupancy of the floor,TEM clearance samples are anticipated for the project. <br /> Task 3—Designer's Final Review/Report <br /> Review of Pre-job and Post Job Submittals .......................................................................................$350.00 <br /> Designers Final Visit/Review/Submittals/Report............................................................................$1,000.00 <br /> Budget Task 3...........................................................$1,350.00 <br /> TOTAL ESTIMATED COST FOR SCOPE OF SERVICES..................................................................$7,600.00 <br /> ASSUMPTIONS <br /> ECS has made the following assumptions in developing this proposal: <br /> • Prices presented herein are valid for 60 days from the date of this proposal. <br /> • Prices are based on performing work on a non-holiday weekday during normal business hours(7:00am <br /> —5:00pm, Monday—Friday). <br /> • Additional project work not specifically addressed by this proposal shall be charged at a time and <br /> materials rate. Additional work, if required, shall be authorized by the client prior to initiation. <br /> Provided conditions are as understood and as assumed, ECS would expect the final costs to be as outlined <br /> above. Should conditions, sampling results or observations indicate that additional work is necessary or <br /> warranted, we would notify you of the additional costs before modifying or expanding the extent of our <br /> scope of services. If other items are required based on field conditions encountered in our field <br /> exploration program, they would be invoiced on an hourly basis. <br /> SCHEDULE <br /> The asbestos removal plans and specifications (Task 1) can be prepared within two weeks of written <br /> authorization to proceed. The schedule associated with Tasks 2 and 3 will be dependent upon the project <br /> schedule. <br /> a <br /> ECS Proposal No.49:22050-P <br /> Page 14 <br /> a <br />