Orange County NC Website
2 <br /> January 2020, Piedmont Triad Regional Council (PTRC) was selected as the consultant, and <br /> beginning on February 6, 2020, Orange County, Mebane, and PTRC have met monthly to <br /> discuss the geographic area of the study, the parcel development suitability criteria and <br /> mechanisms for feedback on the analysis. <br /> During the course of the study, there have been developments in Orange County brought to <br /> Mebane with a focus to rezone and to annex into Mebane. Any development proposals that are <br /> in Orange County and that fall within the study area have been noted as such in Orange County <br /> Planning's feedback to Mebane during the informal courtesy review process. While Mebane has <br /> the ability to annex properties that are willing to be annexed pursuant to state law without <br /> County `approval', Orange County Planning Staff's review of proposals has included language <br /> that informally recommends Mebane delay any further development of parcels that fall within the <br /> Buckhorn Area (but outside the existing utility service agreement) until the Plan is finalized and <br /> has been shared with the public and elected officials. <br /> The BOCC received an Information Item on the Buckhorn Area Plan in its December 15, 2020 <br /> agenda packet. <br /> THE BUCKHORN AREA PLAN (STUDY): <br /> Staff will provide an overview of the Buckhorn Area Plan, which functions as a technical study, <br /> at the BOCC meeting. Some key aspects are provided as attachments herein. A copy of the <br /> full document can be downloaded via the following link: <br /> https://www.ptrc.org/Home/ShowDocument?id=10489 <br /> The study uses GIS mapping to determine parcels most suitable for development within the <br /> focus area. The process allows for a technical review of multiple development factors including: <br /> developable acres, preservation areas, mean slope, watershed, sewer infrastructure, water <br /> infrastructure, interstate access, interstate visibility, roadway access, and access to existing rail. <br /> In addition to the parcel-level scoring based on objective suitability criteria, there are a few areas <br /> of clustered parcels that have been recommended for long-term growth based on a combination <br /> of final score and high economic development use potential. <br /> The focus area (Attachment 1) for this study was defined after significant consideration of <br /> existing land uses, environmental impacts, and economic development potential. This does not <br /> mean that all areas in the study are proposed for potential change but just an area/base element <br /> of research. The boundaries for the focus area are the rail line to the North; Ben Wilson and <br /> Mattress Factory Roads to the west, Mt. Willing Road and parcels along the 1-85 connector to <br /> the East; Bushy Cook Road and Seven Mile Creek to the South. The City of Mebane and <br /> Orange County Planning, Administrative, Public Works, and Economic Development staffs <br /> worked with the Piedmont Triad Regional Council to ensure parcels with the highest potential <br /> were included in the analysis. It is worth noting, however, that parcels with significant public <br /> utility (schools, churches, cemeteries) were marked as not available for development, <br /> regardless of how well they scored on the parcel suitability criteria. <br /> Attachment 2 indicates the suitability criteria and values used in the scoring analysis contained <br /> in the study. Through the scoring analysis, five potential areas for growth based on size, <br /> access, and needs are identified in Attachment 3. The identification of these five potential <br /> growth areas is the key outcome of the Buckhorn Area Plan (Study). If and how all five potential <br />