Browse
Search
Agenda - 02-16-2021; 4-b - OWASA Annual Update Presentation
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2021
>
Agenda - 02-16-2021 Virtual Business Meeting
>
Agenda - 02-16-2021; 4-b - OWASA Annual Update Presentation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 8:37:10 AM
Creation date
2/11/2021 8:54:26 AM
Metadata
Fields
Template:
BOCC
Date
2/16/2021
Meeting Type
Business
Document Type
Agenda
Agenda Item
4-b
Document Relationships
Agenda 02-16-2021 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2021\Agenda - 02-16-2021 Virtual Business Meeting
Minutes 02-16-2021 Virtual Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Information on OWASA's Long-Range Water Supply Plan 16 <br /> January 29,2021 <br /> Page 10 <br /> o Recommendation: Eliminate from further evaluation since it is not legal <br /> • Alternative 9: Direct Potable Reuse—Under this alternative, additional treatment <br /> would be constructed at the Mason Farm WWTP and treated water would then be <br /> pumped directly to our distribution system. Two methods of treating the reclaimed water <br /> were identified: (1)use of carbon(generally preferred since typically lower capital and <br /> operating/maintenance costs) and(2)reverse osmosis—may be required to removed total <br /> dissolved solids. <br /> o Recommendation: Eliminate from further evaluation since it is not legal <br /> OWASA considered four main demand management alternatives based on research and <br /> stakeholder engagement with the Towns and UNC Chapel Hill. Three of these alternatives <br /> involve the use of reclaimed water and one is a series of programmatic demand management <br /> strategies that collectively had the potential to reduce water demand to a degree that could delay <br /> the need for additional supply. <br /> • Alternative 10: Reclaimed Water to UNC Cogeneration Facility—This alternative <br /> involves the installation, operation and maintenance of new infrastructure that would <br /> enable UNC to use RCW instead of drinking water at its Cogeneration Facility. <br /> o Recommendation: Eliminate from further evaluation due to very high capital <br /> cost per gallon of water saved and UNC concerns about quality requirements <br /> • Alternative 11: Expanded Reclaimed Water Use at UNC Main Campus —This <br /> alternative involves expanding the use of reclaimed water on UNC's campus to meet <br /> certain non-drinking water demands in new buildings envisioned in the University's <br /> recently updated Master Plan. <br /> o Recommendation: Eliminate from further evaluation due to high life cycle cost <br /> per gallon of water saved <br /> • Alternative 12: Onsite Wastewater Treatment and Reuse—This alternative evaluated <br /> the use of reclaimed water systems to meet non-drinking water needs at the building or <br /> major development scale. <br /> o Recommendation: Eliminated from evaluation due to high capital and life cycle <br /> costs per gallon of water saved <br /> • Alternative 13: Programmatic Demand Management Strategies—Four alternatives were <br /> evaluated: <br /> o Alternative 13a: Unit Submetering and WaterSense Installation—Multi- <br /> family development is projected to be a significant area of water use growth in <br /> our service area. Sub-metering will help to ensure that the users of water within <br /> those developments are aware of the amount of water they use. This strategy was <br /> coupled with a requirement for developers to use high efficiency WaterSense <br /> fixtures. The impact was assumed to be relatively minor because most new <br /> developments are installing submeters without a requirement. <br /> o Recommendation: Eliminate from including as long-range water supply <br /> option because of minor impact on water use; consider as part of Water <br /> Conservation Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.