Orange County NC Website
Information on OWASA's Long-Range Water Supply Plan 15 <br /> January 29,2021 <br /> Page 9 <br /> o Recommendation: Alternative not feasible at this time <br /> • Alternative 4—Develop Agreement with Western Intake Partners to Guarantee <br /> Access to Jordan Lake Water—OWASA would develop an agreement with the <br /> Western Intake Partners to guarantee capacity in the proposed intake and water treatment <br /> plant on the western side of Jordan Lake. This agreement would guarantee a certain <br /> amount of water on an annual basis in return for payment from OWASA. <br /> o Recommendation: Continue to evaluate <br /> Two Quarry Reservoir supply alternatives were evaluated: <br /> • Alternative 5—Shallow Quarry—access with existing pumping infrastructure. This is <br /> the alternative selected in the 2010 LRWSP and considered the future baseline <br /> alternative. The yield from the expanded Quarry Reservoir is included on Figure 3. <br /> o Recommendation: Baseline condition; included in our capital improvements <br /> program <br /> • Alternative 6—Deep Quarry—deeper quarry depths would be accessed with new <br /> pumping infrastructure when the expanded Quarry Reservoir is online. <br /> o Recommendation: Eliminate from further consideration due to high capital cost <br /> and does not address vulnerability of small Cane Creek Reservoir watershed <br /> OWASA evaluated the use of reclaimed water(highly treated wastewater) for drinking (potable) <br /> water uses. As used in our LRWSP, indirect potable reuse involves mixing reclaimed water in an <br /> environmental buffer prior to being treated at the Jones Ferry Road WTP; direct potable reuse <br /> involves further treating the reclaimed water at the Mason Farm Wastewater Treatment Plant <br /> (WWTP) and then pumping it directly into our water distribution system. Potable reuse <br /> alternatives evaluated are summarized below: <br /> • Alternative 7a: Indirect Potable Reuse with Pretreatment Mixing Basin near <br /> Quarry Reservoir—This alternative was developed to meet the requirements of a <br /> general statute which allows for indirect potable reuse mixed at specified ratios with <br /> another source water in an engineered pretreatment mixing basin. Reclaimed water from <br /> the Mason Farm WWTP would be pumped to a new pretreatment mixing basin near the <br /> Quarry Reservoir. This water would be mixed with water from Cane Creek Reservoir in <br /> accordance with the statute. <br /> o Recommendation: Eliminate from further evaluation since very high capital and <br /> life cycle costs <br /> • Alternative 7b: Indirect Potable Reuse with Return to Quarry Reservoir—This <br /> alternative is similar to Alternative 7a,but water from the Mason Farm WWTP would be <br /> pumped to the Quarry Reservoir rather than a new pretreatment mixing basin. <br /> o Recommendation: Eliminate from further evaluation since very high capital and <br /> life cycle costs <br /> • Alternative 8: Indirect Potable Reuse with Return to University Lake—Reclaimed <br /> water from the Mason Farm WWTP is returned to University Lake. <br />