Orange County NC Website
DocuSign Envelope ID:7BCE8ED6-7B33-485B-9DED-EFB2EC7A5394 <br /> Attachment 2 <br /> Price per ton for grinding of materials as outlined in Scope of Work: <br /> Twelve Dollars($12.00) per ton <br /> The unit price shall include all equipment, labor, personnel,transportation, lodging, insurance, <br /> administrative, and any other associated costs incurred by the vendors to fulfill the obligation of the <br /> project. <br /> Price per ton for loading and hauling of materials: <br /> Nine Dollars($9.00) per ton <br /> The unit price shall include all equipment, labor, personnel,transportation, lodging, insurance, <br /> administrative, and any other associated costs incurred by the vendors to fulfill the obligation of the <br /> project. <br /> Price per ton for hauling of materials loaded by the County: <br /> Eight Dollars($8.00) per ton <br /> The unit price shall include all equipment, labor, personnel, transportation, lodging, insurance, <br /> administrative, and any other associated costs incurred by the vendors to complete removal of <br /> material after loading by OCSWM staff. <br />