Orange County NC Website
DocuSign Envelope ID:D561B1AE-DF34-4907-AD06-AOEB37BBE427 <br /> CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12,2020 <br /> 308 WEST FRANKLIN,CHAPEL HILL,NC <br /> 2. Reinforce doors and frames to receive nontemplated, mortised and surface-mounted door <br /> hardware. <br /> 3. Comply with applicable requirements in ANSUSDI A250.6 and ANSI/DHI Al 15 Series <br /> specifications for preparation of hollow metal work for hardware. <br /> 4. Coordinate locations of conduit and wiring boxes for electrical connections with <br /> Division 26 Sections. <br /> F. Stops and Moldings: Provide stops and moldings around glazed lites where indicated. Form <br /> corners of stops and moldings with butted or mitered hairline joints. <br /> 1. Single Glazed Lites: Provide fixed stops and moldings welded on secure side of hollow <br /> metal work. <br /> 2. Multiple Glazed Lites: Provide fixed and removable stops and moldings so that each <br /> glazed lite is capable of being removed independently. <br /> 3. Provide fixed frame moldings on outside of exterior and on secure side of interior doors <br /> and frames. <br /> 4. Provide loose stops and moldings on inside of hollow metal work. <br /> 5. Coordinate rabbet width between fixed and removable stops with type of glazing and <br /> type of installation indicated. <br /> 2.6 STEEL FINISHES <br /> A. Prime Finish: Apply manufacturer's standard primer immediately after cleaning and pretreating. <br /> 1. Shop Primer: Manufacturer's standard, fast-curing, lead- and chromate-free primer <br /> complying with ANSUSDI A250.10 acceptance criteria; recommended by primer <br /> manufacturer for substrate; compatible with substrate and field-applied coatings despite <br /> prolonged exposure. <br /> PART 3 -EXECUTION <br /> 3.1 EXAMINATION <br /> A. Examine substrates, areas, and conditions, with Installer present, for compliance with <br /> requirements for installation tolerances and other conditions affecting performance of the Work. <br /> B. Examine roughing-in for embedded and built-in anchors to verify actual locations before frame <br /> installation. <br /> C. For the record, prepare written report, endorsed by Installer, listing conditions detrimental to <br /> performance of the Work. <br /> D. Proceed with installation only after unsatisfactory conditions have been corrected. <br /> HOLLOW METAL DOORS AND FRAMES 081113 - 7 <br />