Browse
Search
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 1:37:41 PM
Creation date
2/9/2021 12:21:45 PM
Metadata
Fields
Template:
Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:D561B1AE-DF34-4907-AD06-AOEB37BBE427 <br /> CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12,2020 <br /> 308 WEST FRANKLIN,CHAPEL HILL,NC <br /> 1.4 SUBMITTALS <br /> A. Product Data: For each type of product indicated. Include construction details, material <br /> descriptions, core descriptions, fire-resistance rating,temperature-rise ratings,and finishes. <br /> B. Shop Drawings: Include the following: <br /> 1. Elevations of each door design. <br /> 2. Details of doors,including vertical and horizontal edge details and metal thicknesses. <br /> 3. Frame details for each frame type, including dimensioned profiles and metal thicknesses. <br /> 4. Locations of reinforcement and preparations for hardware. <br /> 5. Details of each different wall opening condition. <br /> 6. Details of anchorages,joints,field splices,and connections. <br /> 7. Details of accessories. <br /> 8. Details of moldings,removable stops, and glazing. <br /> 9. Details of conduit and preparations for power, signal, and control systems. <br /> C. Other Action Submittals: <br /> 1. Schedule: Provide a schedule of hollow metal work prepared by or under the supervision <br /> of supplier,using same reference numbers for details and openings as those on Drawings. <br /> Coordinate with door hardware schedule. <br /> D. Oversize Construction Certification: For assemblies required to be fire rated and exceeding <br /> limitations of labeled assemblies. <br /> E. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified <br /> testing agency, for each type of hollow metal door and frame assembly. <br /> 1.5 QUALITY ASSURANCE <br /> A. Source Limitations: Obtain hollow metal work from single source from single manufacturer. <br /> B. Smoke-Control Door Assemblies: Comply with NFPA 105 or UL 1784. <br /> C. Preinstallation Conference: Conduct conference at Project site. <br /> 1.6 DELIVERY, STORAGE,AND HANDLING <br /> A. Deliver hollow metal work palletized, wrapped, or crated to provide protection during transit <br /> and Project-site storage. Do not use non-vented plastic. <br /> 1. Provide additional protection to prevent damage to finish of factory-finished units. <br /> B. Deliver welded frames with two removable spreader bars across bottom of frames, tack welded <br /> to jambs and mullions. <br /> HOLLOW METAL DOORS AND FRAMES 081113 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.