Browse
Search
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 1:37:41 PM
Creation date
2/9/2021 12:21:45 PM
Metadata
Fields
Template:
Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: D561B1AE-DF34-4907-AD06-AOEB37BBE427 <br /> SECTION 004113-BID FORM-STIPULATED SUM(SINGLE-PRIME CONTRACT) <br /> PART 1 BID FORM STIPULATED SUM(SINGLE-PRIME CONTRACT) � <br /> i <br /> 1.1 BID INFORMATION <br /> A. Bidder. et <br /> B. Project Name: Chapel Hill Orange County Visitors Bureau <br /> II <br /> C. Project Location:308 West Franklin Street,Chapel Hill NC 27516. <br /> D. Owner: Orange County Government. <br /> E. Architect: JGA Architects. <br /> 1.2 CERTIFICATIONS AND BASE BID <br /> A. Base Bid, Single-Prime(All Trades)Contract:The undersigned Bidder,having carefully examined the <br /> Procurement and Contracting Requirements,Conditions of the Contract,Drawings, Specifications,and <br /> all subsequent Addenda,as prepared by JGA Architects and Architect's consultants,having visited the <br /> site,and being familiar with all conditions and requirements of the Work,hereby agrees to furnish all <br /> material,labor,equipment and services,including all scheduled allowances,necessary to complete the <br /> construction of the above-named project,according to the requirements of the Procurement and <br /> Contracting Documents,for the stipulated sum of- <br /> I tholle Bidder ars($�� <br /> 2 The above amoun�may �modif�eby amounts indicated by from the"Schedule of <br /> Alternates"on the attached drawing sheet GOO Coversheet <br /> 1.3 SUBCONTRACTORS AND SUPPLIERS <br /> A.The following companies shall execute subcontracts for the portions of the Work indicated: <br /> i <br /> 1 General Subcontractor: ul Lic. <br /> 2 Plumbing Subcontractor: [.tiA�1 4t Lic. / d� <br /> 3 HVAC Subcontractor: Lic. <br /> 4 Electrical Subcontractor: GfICG Lie. g.8 <br /> 1.4 TIME OF COMPLETION <br /> A. The undersigned Bidder proposes and agrees hereby to commence the Work of the Contract <br /> Documents on a date specified in a written Notice to Proceed to be issued by Architect,and shall <br /> fully complete the Work within 90 calendar days. <br />
The URL can be used to link to this page
Your browser does not support the video tag.