Browse
Search
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 1:37:41 PM
Creation date
2/9/2021 12:21:45 PM
Metadata
Fields
Template:
Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:D561B1AE-DF34-4907-AD06-AOEB37BBE427 <br /> CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12,2020 <br /> 308 WEST FRANKLIN,CHAPEL HILL,NC <br /> a. AGM Industries,Inc.;RC 150. <br /> b. AGM Industries,Inc.; SC150. <br /> C. Gemco;Dome-Cap. <br /> d. Gemco; R-150. <br /> e. Gemco; 5-150. <br /> 2. Protect ends with capped self-locking washers incorporating a spring steel insert to ensure <br /> permanent retention of cap in the following locations: <br /> a. Ceiling plenums, <br /> b. Underside of horizontal Concrete sections <br /> C. Vertical Concrete wall sections <br /> d. Where indicated. <br /> D. Anchor Adhesive: Product with demonstrated capability to bond insulation anchors securely to <br /> substrates indicated without damaging insulation, fasteners, and substrates. <br /> 1. Products: <br /> a. AGM Industries,Inc.; TACTOO Adhesive. <br /> b. Eckel Industries of Canada; Stic-Klip Type S Adhesive. <br /> C. Gemco; Tuff Bond Hanger Adhesive. <br /> PART 3 -EXECUTION <br /> 3.1 EXAMINATION <br /> A. Examine substrates and conditions, with Installer present, for compliance with requirements of <br /> Sections in which substrates and related work are specified and for other conditions affecting <br /> performance. <br /> 1. Proceed with installation only after unsatisfactory conditions have been corrected. <br /> 3.2 PREPARATION <br /> A. Clean substrates of substances harmful to insulation or vapor retarders, including removing <br /> projections capable of puncturing vapor retarders or of interfering with insulation attachment. <br /> 3.3 INSTALLATION, GENERAL <br /> A. Comply with insulation manufacturer's written instructions applicable to products and <br /> application indicated. <br /> B. Install insulation that is undamaged, dry, and unsoiled and that has not been left exposed at any <br /> time to ice,rain, and snow. <br /> THERMAL INSULATION 072100 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.