Browse
Search
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 1:37:41 PM
Creation date
2/9/2021 12:21:45 PM
Metadata
Fields
Template:
Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:D561B1AE-DF34-4907-AD06-AOEB37BBE427 <br /> CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12,2020 <br /> 308 WEST FRANKLIN,CHAPEL HILL,NC <br /> 1. Backpriming: Apply one coat of sealer or primer, compatible with finish coats, to <br /> concealed surfaces of woodwork. Apply two coats to back of paneling and to end-grain <br /> surfaces. Concealed surfaces of plastic-laminate-clad woodwork do not require <br /> backpriming when surfaced with plastic laminate,backing paper. <br /> E. Transparent Finish: <br /> 1. Grade: Premium <br /> 2. AWI Finish System: Synthetic penetrating oil.. <br /> 3. AWI Finish System: Conversion varnish. <br /> 4. Open Finish for Open-Grain Woods: Do not apply filler to open-grain woods. <br /> Sheen: Satin, 31-45 gloss units measured on 60-degree gloss meter per ASTM D 523. <br /> F. Opaque Finish: <br /> 1. Grade: Premium <br /> 2. AWI Finish System: Conversion varnish. <br /> 3. Color: Match ID sample or As selected by ID from manufacturer's full range. <br /> 4. Satin, 31-45 gloss units measured on 60-degree gloss meter per ASTM D 523. <br /> PART 3 -EXECUTION <br /> 3.1 PREPARATION <br /> A. Before installation, condition woodwork to average prevailing humidity conditions in installation <br /> areas. <br /> B. Before installing architectural woodwork, examine shop-fabricated work for completion and <br /> complete work as required, including removal of packing and backpriming. <br /> 3.2 INSTALLATION <br /> A. Grade: Install woodwork to comply with requirements for the same grade specified in Part 2 for <br /> fabrication of type of woodwork involved. <br /> B. Assemble woodwork and complete fabrication at Project site to comply with requirements for <br /> fabrication in Part 2,to extent that it was not completed in the shop. <br /> C. Install woodwork level, plumb, true, and straight. Shim as required with concealed shims. Install <br /> level and plumb (including tops)to a tolerance of 1/8 inch in 96 inches (3 min in 2400 mm). <br /> D. Scribe and cut woodwork to fit adjoining work, refinish cut surfaces, and repair damaged finish at <br /> cuts <br /> E. Fire-Retardant-Treated Wood: Handle, store, and install fire-retardant-treated wood to comply <br /> with chemical treatment manufacturer's written instructions, including those for adhesives used <br /> to install woodwork. <br /> INTERIOR ARCHITECTURAL WOODWORK 064023 - 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.