Browse
Search
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 1:37:41 PM
Creation date
2/9/2021 12:21:45 PM
Metadata
Fields
Template:
Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:D561B1AE-DF34-4907-AD06-AOEB37BBE427 <br /> CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12,2020 <br /> 308 WEST FRANKLIN,CHAPEL HILL,NC <br /> b. Patterns,matte finish. <br /> D. Edge Treatment: Same as laminate cladding on horizontal surfaces <br /> E. Core Material: Particleboard or medium-density fiberboard <br /> F. Core Material at Sinks: Medium-density fiberboard made with exterior glue <br /> G. Backer Sheet: Provide plastic-laminate backer sheet, Grade BKL, on underside of countertop <br /> substrate. <br /> H. Paper Backing: Provide paper backing on underside of countertop substrate. <br /> 2.10 CLOSET SHELVING <br /> A. Closet shelving shall be open wire shelving, maximum 1" X 1" weave. Basis of design is Closet <br /> Maid shelving, S&R closet shelving. <br /> B. Shelves shall be 16" deep, longest width to fit each closet completely. Standard widths to include <br /> 4',6', 8' and 12'. <br /> 1. Shelves to me vinyl coated white. <br /> 2. Include end caps for all exposed wire ends. <br /> 3. Shelves to be steel, 90%minimum recycled material content. <br /> C. Hardware: Provide hardware as specified by manufacturer for maximum load requirements. <br /> 1. Use 12" support brackets at 3' O.C. maximum. Use expansion anchors for attaching <br /> brackets to wall. <br /> 2. Use wall clips at 1' O.C. maximum. <br /> D. Scope: <br /> 1. Provide one shelf at 6' aff of this specified shelving at closets in rooms: 114, 120.1, 120, <br /> above washers and dryers in room 211. <br /> 2.11 SHOP FINISHING <br /> A. Grade: Provide finishes of same grades as items to be finished. <br /> B. General: Shop finish transparent-finished interior architectural woodwork at fabrication shop as <br /> specified in this Section. Refer to Division 09 painting Sections for finishing opaque-finished <br /> architectural woodwork. <br /> C. Shop Priming: Shop apply the prime coat including backpriming, if any, for[transparent-finished] <br /> items specified to be field finished. Refer to Division 09 painting Sections for material and <br /> application requirements. <br /> D. Preparation for Finishing: Comply with referenced quality standard for sanding, filling <br /> countersunk fasteners, sealing concealed surfaces, and similar preparations for finishing <br /> architectural woodwork, as applicable to each unit of work. <br /> INTERIOR ARCHITECTURAL WOODWORK 064023 - 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.