Orange County NC Website
DocuSign Envelope ID:D561B1AE-DF34-4907-AD06-AOEB37BBE427 <br /> CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12,2020 <br /> 308 WEST FRANKLIN,CHAPEL HILL,NC <br /> B. Installer Qualifications: Fabricator of products and/or Certified participant in AWI's Quality <br /> Certification Program. <br /> C. Source Limitations: Engage a qualified woodworking firm to assume undivided responsibility for <br /> production of interior architectural woodwork with sequence-matched wood veneers and wood <br /> doors with face veneers that are sequence matched with woodwork and transparent-finished <br /> wood doors that are required to be of same species as woodwork. <br /> D. Quality Standard: Unless otherwise indicated, comply with AWI's "Architectural Woodwork <br /> Quality Standards" for grades of interior architectural woodwork indicated for construction, <br /> finishes,installation, and other requirements. <br /> 1. Provide AWI Quality Certification Program labels and certificates indicating that <br /> woodwork,(including installation),complies with requirements of grades specified. <br /> E. Fire-Test-Response Characteristics: Where fire-retardant materials or products are indicated, <br /> provide materials and products with specified fire-test-response characteristics as determined by <br /> testing identical products per test method indicated by UL, ITS, or another testing and <br /> inspecting agency acceptable to authorities having jurisdiction. Identify with appropriate <br /> markings of applicable testing and inspecting agency in the form of separable paper label or, <br /> where required by authorities having jurisdiction, imprint on surfaces of materials that will be <br /> concealed from view after installation. <br /> F. Moe"ps� Build moekups to verify selections made under- sample submittals and to demonstfate <br /> aesthetic effects and sot quality standards for materials and execution. <br /> G. Preinstallation Conference: Conduct conference at Project site to comply with requirements in <br /> Division 01 Section "Project Management and Coordination." <br /> 1.6 DELIVERY, STORAGE,AND HANDLING <br /> A. Do not deliver woodwork until painting and similar operations that could damage woodwork have <br /> been completed in installation areas. If woodwork must be stored in other than installation <br /> areas, store only in areas where environmental conditions comply with requirements specified <br /> in"Project Conditions"Article. <br /> 1.7 PROJECT CONDITIONS <br /> A. Environmental Limitations: Do not deliver or install woodwork until building is enclosed, wet <br /> work is complete, and HVAC system is operating and maintaining temperature and relative <br /> humidity at occupancy levels during the remainder of the construction period. <br /> B. Environmental Limitations: Do not deliver or install woodwork until building is enclosed, wet <br /> work is complete, and HVAC system is operating and maintaining temperature between 60 and <br /> 90 deg F (16 and 32 deg C) and relative humidity between 43 and 70 percent during the <br /> remainder of the construction period. <br /> C. Field Measurements: Where woodwork is indicated to fit to other construction, verify dimensions <br /> of other construction by field measurements before fabrication, and indicate measurements on <br /> INTERIOR ARCHITECTURAL WOODWORK 064023 - 3 <br />