Browse
Search
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 1:37:41 PM
Creation date
2/9/2021 12:21:45 PM
Metadata
Fields
Template:
Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: D561BlAE-DF34-4907-AD06-AOEB37BBE427 <br /> CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12,2020 <br /> 308 WEST FRANKLIN,CHAPEL HILL,NC <br /> 3 Pressure treat wood framing in contact with masonry, concrete and sleepers,nailing <br /> strips, etc., in concrete or masonry, and cant strips. Treatment shall be in accordance <br /> with American Wood Preservers Association Specification C-2, "Pressure Treatment of <br /> Lumber to be used in Buildings"with a retention of preservative not less than 0.30 <br /> pounds per cubic foot. <br /> 4 Moisture content of framing lumber shall not exceed 19%. Lumber must be sound, <br /> thoroughly seasoned, and free from warp that cannot be corrected. <br /> 5 Plywood shall be C-D Exterior Grade in thicknesses as indicated on the drawings. <br /> 06100-06 EXECUTION <br /> 1 Use only sound,thoroughly seasoned materials of the longest practical lengths and sizes. <br /> Minimize jointing. Do not incorporate into the work warped or defective materials that <br /> would impair the quality of the work. Studs shall be continuous from sill to plate;no <br /> splicing of studs. <br /> 2 Use common wire nails except as otherwise specified. Do not lubricate or wax friction <br /> fasteners. Make connections tight. Install fasteners without splitting the wood;pre-drill <br /> if required. <br /> 3 Attach carpentry work securely by anchoring and fastening as shown or specified and as <br /> required by Table 2304.10.1 of the North Carolina State Building Code. Provide washers <br /> when bolting at both head and nut. When nailing plywood, comply with <br /> recommendations of the American Plywood Association. <br /> 4 Set carpentry work accurately to required levels,with members plumb and true and <br /> accurately cut and fitted. <br /> 5 Provide necessary blocking, grounds, and nailers where required by other trades for the <br /> secure installation of their work. Provide blocking in walls for accessories. Verify with <br /> Architect the locations of all blocking. <br /> 6 Install anchors where required to anchor carpentry to masonry. Install anchors for door <br /> frames. <br /> END OF SECTION <br /> 06100-Carpentry-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.