Browse
Search
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 1:37:41 PM
Creation date
2/9/2021 12:21:45 PM
Metadata
Fields
Template:
Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: D561BlAE-DF34-4907-AD06-AOEB37BBE427 <br /> CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12, 2020 <br /> 308 WEST FRANKLIN,CHAPEL HILL,NC <br /> B. The allowance does not include incidental labor required to assist the testing agency or costs for <br /> retesting if previous tests and inspections result in failure. The cost for incidental labor to assist <br /> the testing agency shall be included in the Contract Sum. <br /> C. Costs of services not required by the Contract Documents are not included in the allowance. <br /> D. At Project closeout, credit unused amounts remaining in the testing and inspecting allowance to <br /> Owner by Change Order. <br /> 1.9 UNUSED MATERIALS <br /> A. Return unused materials purchased under an allowance to manufacturer or supplier for credit to <br /> Owner, after installation has been completed and accepted. <br /> 1. If requested by Architect, prepare unused material for storage by Owner when it is not <br /> economically practical to return the material for credit. If directed by Architect, deliver <br /> unused material to Owner's storage space. Otherwise, disposal of unused material is <br /> Contractor's responsibility. <br /> PART 2 -EXECUTION <br /> 2.1 EXAMINATION <br /> A. Examine products covered by an allowance promptly on delivery for damage or defects. Return <br /> damaged or defective products to manufacturer for replacement. <br /> 2.2 PREPARATION <br /> A. Coordinate materials and their installation for each allowance with related materials and <br /> installations to ensure that each allowance item is completely integrated and interfaced with <br /> related work. <br /> 2.3 SCHEDULE OF ALLOWANCES <br /> A. Allowance No.01 Door Hardware: Include Door Hardware allowance of$10,000.00 <br /> B. Allowance No. 02_Ceramic Tile: Include CT allowance of$15.00 per square foot. <br /> C. Allowance No. 03 Toilet Room Accessories: Include allowance of$3,500.00 <br /> D. Allowance No.04_Room Signs: Include allowance of$1,000.00 for room signs. <br /> E. Allowance No. 05_Carpet: provide $35.00/yard carpet allowance. <br /> END OF SECTION 012100 <br /> ALLOWANCES 012100 - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.