Browse
Search
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 1:37:41 PM
Creation date
2/9/2021 12:21:45 PM
Metadata
Fields
Template:
Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:D561B1AE-DF34-4907-AD06-AOEB37BBE427 <br /> CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12,2020 <br /> 308 WEST FRANKLIN,CHAPEL HILL,NC <br /> 1. Size: 6 by 6 inches(150 by 150 mm) square. <br /> E. Product Schedule: For fire protection cabinets. Coordinate final fire protection cabinet schedule <br /> with fire extinguisher schedule to ensure proper fit and function. <br /> F. Maintenance Data: For fire protection cabinets to include in maintenance manuals. <br /> 1.4 QUALITY ASSURANCE <br /> A. Fire-Rated, Fire Protection Cabinets: Listed and labeled to comply with requirements in <br /> ASTM E 814 for fire-resistance rating of walls where they are installed. <br /> B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, <br /> by a qualified testing agency, and marked for intended location and application. <br /> C. Preinstallation Conference: Conduct conference at Project site. <br /> 1. Review methods and procedures related to fire protection cabinets including, but not <br /> limited to,the following: <br /> a. Schedules and coordination requirements. <br /> b. Coordinate with local Fire Marshall for exact cabinet locations <br /> 1.5 COORDINATION <br /> A. Coordinate size of fire protection cabinets to ensure that type and capacity of fire extinguishers <br /> indicated are accommodated. <br /> B. Coordinate size of fire protection cabinets to ensure that type and capacity of fire hoses, hose <br /> valves, and hose racks indicated are accommodated. <br /> C. Coordinate sizes and locations of fire protection cabinets with wall depths. <br /> 1.6 SEQUENCING <br /> A. Apply vinyl lettering on field-painted, fire protection cabinets after painting is complete. <br /> PART 2 -PRODUCTS <br /> 2.1 MATERIALS <br /> A. Cold-Rolled Steel Sheet: ASTM A 1008/A 1008M, Commercial Steel(CS), Type B. <br /> B. Aluminum: Alloy and temper recommended by aluminum producer and manufacturer for type <br /> of use and finish indicated, and as follows: <br /> FIRE EXTINGUISHER CABINETS 104413 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.