Browse
Search
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 1:37:41 PM
Creation date
2/9/2021 12:21:45 PM
Metadata
Fields
Template:
Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:D561B1AE-DF34-4907-AD06-AOEB37BBE427 <br /> CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12,2020 <br /> 308 WEST FRANKLIN,CHAPEL HILL,NC <br /> Door Configuration: As indicated on drawings. <br /> Height: 2 inch (51 mm). <br /> Length: 6-7/16 inch (164 mm). <br /> Cladding Finish: Satin anodized. <br /> Glass Thickness: 1/2 inch (12.7 mm),tempered. <br /> Door Hardware: Patch bottom fitting,brushed stainless steel. <br /> Provide accessories as required for complete installation. <br /> 2.2 EXECUTION <br /> A. Verify that field measurements are as indicated. <br /> B. Verify that track supports are properly braced,level within 1/4 inch (6 mm) of required <br /> position and parallel to the floor surface. <br /> C. Verify floor flatness of 1/8 inch in 10 feet(3 mm in 3 m),non-cumulative. <br /> D. Do not begin installation until supports and adjacent substrates have been properly prepared. <br /> E. If substrate preparation is the responsibility of another installer,notify Architect of <br /> unsatisfactory preparation before proceeding. <br /> 2.3 PREPARATION <br /> A. Clean substrates thoroughly prior to installation. <br /> B. Prepare substrates using the methods recommended by the manufacturer for achieving ac <br /> acceptable result for the substrate under the project conditions. <br /> 3.1 INSTALLATION <br /> A. Install in accordance with glazed interior wall and door assembly manufacturer's instructions. <br /> B. Fit and align glazed interior wall and door assembly level and plumb. <br /> 3.2 ADJUSTING <br /> A. Adjust glazed interior wall and door assembly to operate smoothly from sliding or pivoting <br /> positions. <br /> B. Adjust swing door hardware for smooth operation. <br /> 3.3 CLEANING <br /> A. Clean installed work to like-new condition. <br /> 4.1 CLOSEOUT ACTIVITIES <br /> A. See Section DESRIBING-Closeout Submittals, for closeout submittals. <br /> B. Demonstrate operation of glazed interior wall and door assembly and identify potential <br /> operational problems. <br /> 4.2 PROTECTION <br /> A. Protect installed products until completion of project. <br /> B. Touch-up,repair or replace damaged products before date of Substantial Completion. <br /> END OF SECTION 102310 <br /> INTERIOR GLASS PARTITION 102310 - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.