Orange County NC Website
DocuSign Envelope ID:D561B1AE-DF34-4907-AD06-AOEB37BBE427 <br /> CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12,2020 <br /> 308 WEST FRANKLIN,CHAPEL HILL,NC <br /> 1. After completing finishing operations, reinstall items that were removed; use workers <br /> skilled in the trades involved. Remove surface-applied protection if any. <br /> C. Clean and prepare surfaces to be finished according to manufacturer's written instructions for <br /> each particular substrate condition and as specified. <br /> 1. Remove surface dirt, oil, or grease by washing with a detergent solution;rinse thoroughly <br /> with clean water and allow to dry. Remove grade stamps and pencil marks by sanding <br /> lightly. Remove loose wood fibers by brushing. <br /> 2. Remove mildew by scrubbing with a commercial wash formulated for mildew removal <br /> and as recommended by stain manufacturer. <br /> 3. Countersink steel nails, if used, and fill with putty tinted to final color to eliminate rust <br /> leach stains. <br /> D. Apply wood filler paste to open-grain woods, as defined in "MPI Architectural Painting <br /> Specification Manual," to produce smooth,glasslike finish. <br /> 3.3 APPLICATION <br /> A. Apply finishes according to manufacturer's written instructions. <br /> 1. Use applicators and techniques suited for finish and substrate indicated. <br /> 2. Finish surfaces behind movable equipment and furniture same as similar exposed <br /> surfaces. <br /> B. Apply finishes to produce surface films without cloudiness, holidays, lap marks, brush marks, <br /> runs,ropiness,or other surface imperfections. <br /> 3.4 FIELD QUALITY CONTROL <br /> A. Owner reserves the right to invoke the following procedure at any time and as often as Owner <br /> deems necessary during the period when finishes are being applied: <br /> 1. Owner will engage the services of a qualified testing agency to sample finish materials <br /> being used. Samples of material delivered to Project site will be taken, identified, sealed, <br /> and certified in presence of Contractor. <br /> 2. Testing agency will perform tests for compliance with product requirements. <br /> 3. Owner may direct Contractor to stop applying finishes if test results show materials being <br /> used do not comply with product requirements. Contractor shall remove noncomplying <br /> materials from Project site, pay for testing, and refinish surfaces finished with rejected <br /> materials. Contractor will be required to remove rejected materials from previously <br /> finished surfaces if, on refinishing with complying materials, the two finishes are <br /> incompatible. <br /> STAINING AND TRANSPARENT FINISHING 099300 - 7 <br />