Orange County NC Website
DocuSign Envelope ID:D561B1AE-DF34-4907-AD06-AOEB37BBE427 <br /> CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12,2020 <br /> 308 WEST FRANKLIN,CHAPEL HILL,NC <br /> B. Tint each undercoat a lighter shade to facilitate identification of each coat if multiple coats of <br /> same material are to be applied. Tint undercoats to match color of topcoat, but provide <br /> sufficient difference in shade of undercoats to distinguish each separate coat. <br /> C. If undercoats or other conditions show through topcoat, apply additional coats until cured film <br /> has a uniform paint finish,color, and appearance. <br /> D. Apply paints to produce surface films without cloudiness, spotting, holidays, laps, brush marks, <br /> roller tracking, runs, sags, ropiness, or other surface imperfections. Cut in sharp lines and color <br /> breaks. <br /> E. Painting Mechanical and Electrical Work: Paint visible items in and occupied spaces including, <br /> but not limited to,the following: <br /> 1. Mechanical Work: <br /> a. Uninsulated metal piping. <br /> b. Uninsulated plastic piping. <br /> C. Pipe hangers and supports. <br /> d. Tanks that do not have factory-applied final finishes. <br /> e. Visible portions of internal surfaces of metal ducts, without liner, behind air inlets <br /> and outlets. <br /> f. Duct, equipment, and pipe insulation having cotton or canvas insulation covering <br /> or other paintable jacket material. <br /> g. Mechanical equipment that is indicated to have a factory-primed finish for field <br /> painting. <br /> 2. Electrical Work: <br /> a. Switchgear. <br /> b. Panelboards. <br /> C. Electrical equipment that is indicated to have a factory-primed finish for field <br /> painting. <br /> 3.4 FIELD QUALITY CONTROL <br /> A. Testing of Paint Materials: Owner reserves the right to invoke the following procedure at any <br /> time and as often as Owner deems necessary during the period when paints are being applied: <br /> 1. Owner will engage the services of a qualified testing agency to sample paint materials <br /> being used. Samples of material delivered to Project site will be taken, identified, sealed, <br /> and certified in presence of Contractor. <br /> 2. Testing agency will perform tests for compliance with product requirements. <br /> 3. Owner may direct Contractor to stop applying paints if test results show materials being <br /> used do not comply with product requirements. Contractor shall remove noncomplying- <br /> paint materials from Project site, pay for testing, and repaint surfaces painted with <br /> rejected materials. Contractor will be required to remove rejected materials from <br /> previously painted surfaces if, on repainting with complying materials, the two paints are <br /> incompatible. <br /> INTERIOR PAINTING 099123 -7 <br />