Orange County NC Website
DocuSign Envelope ID: D561B1AE-DF34-4907-AD06-AOEB37BBE427 <br /> JOSH GURLITZ ARCHITECTS <br /> HA NGO DESIGN PRINCIPAL <br /> 6' 0" 3' 0" <br /> 308 WEST ROSEMARY STREET, SUITE 302 <br /> CHAPEL HILL, NC 27516 <br /> 919.929.7595 F.919.967.9636 <br /> REMOVE LAVS AND ALL <br /> TILE FROM BOTH TOILET TILE FLOOR TO BE REMOVED A L A M A N C E CONSULTING <br /> ROOMS.DEEP CLEAN ENGINEER S <br /> EXISTING TOILETS. <br /> 961-F BURLINGTON AVE. <br /> REMOVE FRAMING GIBSONVILLE, NC 27249 <br /> FOR DOOR... n <br /> 704.886.5733 <br /> L L L <br /> REIVICVEAL41VIISCELLNNEO S NEVILLE ENGINEERING <br /> O N <br /> N <br /> ° CHAPEL HILL, NC 27516 <br /> 0 REMOVE FRAMING 919.942.5229 <br /> FOR DOOR... <br /> BALLENTINE ASSOCIATES, PA <br /> j� REMOVE LAVS AND ALL 221 PROVIDENCE ROAD <br /> TILE FROM BOTH TOILET <br /> ROOMS.DEEP CLEAN CHAPEL HILL, NC 27516 <br /> EXISTING TOILETS. EM V 919.929.0481 F.919.489.2803 <br /> OF K IN A TI . CLEAN AND SANITIZE WALLS <br /> CEILINGS AND FLOORS IN <br /> COOLER.O <br /> Ct <br /> f- --1 <br /> KOA ALS GE_LA <br /> - <br /> I _ 2 Q IW E O O IR R P,DI RECTED <br /> REMOVE COOLER DOORS <br /> °Q I - - - - - - - - - - - - - - - - - 0 �� -' FROM HINGES AND STORE <br /> 9'-0" i 14'-5" 12'-2" 6'-0" ON SITE <br /> i . ; T t T <br /> -+---F---,?-------- - <br /> ' �� I i i i <br /> -T-- --- --- --T-- --- --- --T-- --- - - - T I - -- -- ------ <br /> , <br /> -11 <br /> ------- -------------------------------------------------------- <br /> REMOVE BAR,SUPPORTING WALL STRUCTURE <br /> TILE FLOOR AND OTHER APPURTENANT BAR ELEMENTS. 1'-7" T-8" T-0" T-8" 1'4- o <br /> a ■ ■ <br /> � W <br /> CLEAN AND SANITIZE WALLS, <br /> 7'-10" 11-------------- ------- ------------ ------ I I ------------------------ ------------------------ ------------------------ CEILINGS AND FLOORS IN <br /> — — ER MIN AT G S O N E 10 �\ <br /> REMOVE ALL FIVE�_SEPARA OR I I � A PERDIRECTIONS EL W <br /> _ - WALL IN MAIN AREA. I I REMOVE GY BD. <br /> AND FRAMI G. <br /> I p BRACE AS &D.. <br /> V-611 <br /> to L <br /> O <br /> ��N I � W <br /> ° "' <br /> RE 'MOVE GYP.BD. <br /> AND FRAMING. <br /> I I BRACE AS REQ'D.. <br /> ol 4'-10" <br /> REMOVE GYP.BD.FROM E O E Y .B <br /> REMOVE TWO NORTH END CEILING MOUNT ALL CEILINGS LESS THAN TILE FLOOR TO BE REMOVED <br /> SOUND BAFFLES.RE-INSTALL TWO BAFFLES 8'A.F.F..THIS AREA. <br /> AT SOUTH END. O <br /> 2'-3" REMOVE INTERIOR CLOSURE AT THESE <br /> O <br /> TWO EXISTING WINDOWS <br /> DEMOLITION PLAN I SSUE/REVISION DATE NO. <br /> SCALE 4" = 1 '-0" <br /> DEFINITIONS If services/systems are required to be removed, relocated,or abandoned, before proceeding with selective Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. <br /> demolition provide temporary services/systems that bypass area of selective demolition and that maintain con- Provide connections,supports,and miscellaneous materials necessary to make item functional for use indicat- <br /> Remove: Detach items from existing construction and legally dispose of them off-site, unless indicated to be tinuity of services/systems to other parts of building. ed. <br /> removed and salvaged or removed and reinstalled. Cut off pipe or conduit in walls or partitions to be removed. Cap,valve,or plug and seal remaining portion of Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selec- <br /> Remove and Salvage: Detach items from existing construction and deliver them to Owner ready for reuse. pipe or conduit after bypassing. tive demolition. When permitted by Architect, items may be removed to a suitable, protected storage location <br /> Remove and Reinstall: Detach items from existing construction, prepare them for reuse,and reinstall them Where entire wall is to be removed,existing services/systems may be removed with removal of the wall. during selective demolition and cleaned and reinstalled in their original locations after selective demolition op- <br /> where indicated.This refers to the kitchen hood. erations are complete. <br /> Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indi- PREPARATION <br /> cated to be removed,removed and salvaged,or removed and reinstalled. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS <br /> minimum interference with roads,streets,walks,walkways,and other adjacent occupied and used facilities. Masonry: Demolish in small sections. Cut masonry at junctures with construction to remain, using power- <br /> MATERIALS OWNERSHIP Temporary Facilities: Provide temporary barricades and other protection required to prevent injury to people driven saw,then remove masonry between saw cuts. <br /> Items of interest or value to Owner that may be encountered during selective demolition remain Owner's prop- and damage to adjacent buildings and facilities to remain. Concrete Slabs-on-Grade: Saw-cut perimeter of area to be demolished,then break up and remove. <br /> erty. Carefully remove and salvage each item or object in a manner to prevent damage and deliver promptly to Provide protection to ensure safe passage of people around selective demolition area and to and from occu- Floor Coverings: Remove floor coverings and adhesive Remove residual adhesive and prepare substrate for COPYRIGHT @ 2019, <br /> Owner. pied portions of building if applicable. new floor surfacing. JOSH GURLITZ ARCHITECTS (JGA) <br /> Provide temporary weather protection,during interval between selective demolition of existing construction on Air-Conditioning Equipment: Remove equipment without releasing refrigerants. ALL RIGHTS RESERVED <br /> QUALITY ASSURANCE exterior surfaces and new construction,to prevent water leakage and damage to structure and interior areas. NO PART OF THESE PLANS MAY BE COPIED, REPRO- <br /> Refrigerant Recovery Technician Qualifications: Certified by an EPA-approved certification program. Protect walls,ceilings,floors,and other existing finish work that are to remain or that are exposed during selec- DISPOSAL OF DEMOLISHED MATERIALS DUCED OR REUSED IN ANY WAY WITHOUT THE EXPRESS <br /> Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective tive demolition operations. WRITTEN PERMISSION OF JGA ARCHITECTS. <br /> demolition. Comply with hauling and disposal regulations of authorities having jurisdiction. Temporary Shoring: Provide and maintain shoring, bracing,and structural supports as required to preserve General: Except for items or materials indicated to be reused,salvaged, reinstalled,or otherwise indicated to <br /> Standards: Comply with ANSI A10.6 and NFPA 241. stability and prevent movement, settlement,or collapse of construction and finishes to remain,and to prevent remain Owner's property, remove demolished materials from Project site and legally dispose of them in an <br /> Inspect and discuss condition of construction to be selectively demolished. unexpected or uncontrolled movement or collapse of construction being demolished. EPA-approved landfill. <br /> Review structural load limitations of existing structure where applicable. Strengthen or add new supports when required during progress of selective demolition. Do not allow demolished materials to accumulate on-site. <br /> Review requirements of work performed by other trades that rely on substrates exposed by selective demoli- Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas. <br /> tion operations. SELECTIVE DEMOLITION,GENERAL Remove debris from elevated portions of building by chute, hoist,or other device that will convey debris to <br /> Review areas where existing construction is to remain and requires protection. General: Demolish and remove existing construction only to the extent required by new construction and as grade level in a controlled descent. <br /> Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective indicated. Use methods required to complete the Work within limitations of governing regulations and as fol- Comply with requirements specified in Division 01 Section"Construction Waste Management and Disposal." <br /> demolition. lows: Burning: Do not burn demolished materials on any portion of the site. <br /> Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work. Neatly cut openings and holes plumb,square,and true to dimensions required. Use cutting methods least like- Disposal: Transport demolished materials off Owner's property and legally dispose of them. DEMOLITION <br /> If materials suspected of containing hazardous materials are encountered,do not disturb; immediately notify ly to damage construction to remain or adjoining construction. Use hand tools or small power tools designed <br /> Architect and Owner. Owner will remove hazardous materials under a separate contract. for sawing or grinding, not hammering and chopping,to minimize disturbance of adjacent surfaces. Temporari- CLEANING <br /> Storage or sale of removed items or materials on-site is not permitted. ly cover openings to remain. Clean adjacent structure and improvements of dust,dirt,and debris caused by selective demolition operations. <br /> Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage dur Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfac- Return adjacent areas to condition existing before selective demolition operations began. PLAN <br /> ing selective demolition operations. es. <br /> Maintain fire-protection facilities in service during selective demolition operations. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces,such as <br /> duct and pipe interiors,verify condition and contents of hidden space before starting flame-cutting operations. NOTE: Remove all debris and personal items from all attic areas. Dispose of Iawfully.Request Owner and Architect to <br /> EXAMINATION Maintain portable fire-suppression devices during flame-cutting operations. indicate any items to remain.Remove and dispose of all other items. <br /> Verify that utilities to be abandoned have been disconnected and capped. Maintain adequate ventilation when using cutting torches. <br /> Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition Remove decayed,vermin-infested,or otherwise dangerous or unsuitable materials and promptly dispose of Remove and dispose of all items of trash and personal property from main floor,kitchen and all other areas.Clean all <br /> required. off-site. surfaces of debris and grease prior to starting any new work. Redquest Owner and Architect to indicate any items to remain. <br /> Inventory and record the condition of items to be removed and reinstalled and items to be removed and sal- Remove structural framing members and lower to ground by method suitable to avoid free fall and to prevent <br /> vaged. ground impact or dust generation. <br /> When unanticipated mechanical,electrical,or structural elements that conflict with intended function or design Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads <br /> are encountered, investigate and measure the nature and extent of conflict. Promptly submit a written report to on supporting walls,floors,or framing. <br /> Architect. Dispose of demolished items and materials promptly. <br /> Reuse of Building Elements: Project has been designed to result in end-of-Project rates for reuse of building <br /> UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS elements as follows. Do not demolish building elements beyond what is indicated on Drawings without Archi- Project Number: P2_15_2020 <br /> tect's approval. <br /> Existing Services/Systems: Maintain services/systems indicated to remain and protect them against damage Removed and Salvaged Items: Scale: AS NOTED <br /> during selective demolition operations. Clean salvaged items. <br /> Comply with requirements for existing services/systems interruptions specified in Division 01 Section"Sum- Store items in a secure area until delivery to Owner. Date: AUGUST 24,2020 <br /> mary." Protect items from damage during transport and storage. Sheet Number: <br /> Service/System Requirements: Locate, identify,disconnect,and seal or cap off indicated utility services and Removed and Reinstalled Items: <br /> mechanical/electrical systems serving areas to be selectively demolished. Clean and repair items to functional condition adequate for intended reuse. Paint equipment to match new <br /> Contractor will arrange to shut off indicated services/systems when necessary. equipment. <br /> Arrange to shut off indicated utilities with utility companies. Protect items from damage during transport and storage. A� l 02 <br /> ©Josh Gurlitz Architect.All Rights Reserved. <br />