Browse
Search
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 1:37:41 PM
Creation date
2/9/2021 12:21:45 PM
Metadata
Fields
Template:
Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:D561B1AE-DF34-4907-AD06-AOEB37BBE427 <br /> CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12, 2020 <br /> 308 WEST FRANKLIN,CHAPEL HILL,NC <br /> C. Mockups: Before installing carpet, build mockups to verify selections made under sample <br /> submittals and to demonstrate aesthetic effects and set quality standards for materials and <br /> execution. <br /> 1. Approved mockups may become part of the completed Work if undisturbed at time of <br /> Substantial Completion. <br /> D. Preinstallation Conference: Conduct conference at Project site to comply with requirements in <br /> Division 01 Section "Project Management and Coordination." <br /> E. Preinstallation Conference: Conduct conference at Project site to comply with requirements in <br /> Division 01 Section "Project Management and Coordination." Review methods and procedures <br /> related to carpet installation including,but not limited to,the following: <br /> 1. Review delivery, storage, and handling procedures. <br /> 2. Review ambient conditions and ventilation procedures. <br /> 1.5 DELIVERY, STORAGE,AND HANDLING <br /> A. Comply with CRI 104, Section 5, "Storage and Handling." <br /> 1.6 PROJECT CONDITIONS <br /> A. Comply with CRI 104, Section 7.2, "Site Conditions; Temperature and Humidity" and <br /> Section 7.12, "Ventilation." <br /> B. Environmental Limitations: Do not install carpet and carpet cushion until wet work in spaces <br /> is complete and dry, and ambient temperature and humidity conditions are maintained at the <br /> levels indicated for Project when occupied for its intended use. <br /> C. Do not install carpet and carpet cushionover concrete slabs until slabs have cured, are <br /> sufficiently dry to bond with adhesive, and have pH range recommended by carpet <br /> manufacturer. <br /> D. Where demountable partitions or other items are indicated for installation on top of carpet, <br /> install carpet before installing these items. <br /> 1.7 WARRANTY <br /> A. Special Warranty for Carpet: Manufacturer's standard form in which manufacturer agrees to <br /> repair or replace components of carpet installation that fail in materials or workmanship within <br /> specified warranty period. <br /> 1. Warranty does not include deterioration or failure of carpet due to unusual traffic, failure <br /> of substrate,vandalism,or abuse. <br /> 2. Failures include, but are not limited to, more than 10 percent loss of face fiber, edge <br /> raveling, snags,runs, loss of tuft bind strength, excess static discharge, and delamination. <br /> 3. Warranty Period: 10 years from date of Substantial Completion. <br /> SHEET CARPETING 096816 - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.