Browse
Search
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 1:37:41 PM
Creation date
2/9/2021 12:21:45 PM
Metadata
Fields
Template:
Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: D561B1AE-DF34-4907-AD06-AOEB37BBE427 <br /> Page 4 of 6 <br /> 7. Flame Spread/NFPA 101 ASTM E-84 Class A <br /> C. Topcoat Armor Top <br /> 1. VOC 0 g/L <br /> 2. 60 Degree Gloss ASTM D523 75+/-5 <br /> 3. Mixed Viscosity, (Brookfield 25°C) 500 cps <br /> 4. Tensile strength,ASTM D 638 7,000 psi <br /> 5. Abrasion Resistance,ASTM D4060 Gloss Satin <br /> CS 17 wheel(1,000 g load) 1,000 cycles 4 8 mg loss with grit <br /> 10 12 mg loss without grit <br /> 6. Pot life @ 700 F 50%RH 2 hours <br /> 7. Full Chemical resistance 7 days <br /> PART 3 —EXECUTION <br /> 3.1 EXAMINATION <br /> A. Examine substrates, areas and conditions,with Applicator present, for compliance with requirements <br /> for maximum moisture content, installation tolerances and other conditions affecting flooring <br /> performance. <br /> 1. Verify that substrates and conditions are satisfactory for flooring installation and comply with <br /> requirements specified. <br /> 3.2 PREPARATION <br /> A. General <br /> 1. New and existing concrete surfaces shall be free of oil, grease, curing compounds, loose particles, <br /> moss, <br /> algae growth, laitance, friable matter,dirt, and bituminous products. <br /> 2. Moisture Testing: Perform tests recommended by manufacturer and as follows. <br /> a. Perform anhydrous calcium chloride test ASTM F 1869-98.Application will proceed only <br /> when the vapor/moisture emission rates from the slab is less than and not higher than 20 <br /> lbs/1,000 sf/24 hrs. <br /> b. Perform relative humidity test using is situ probes,ASTM F 2170. Proceed with installation <br /> only after substrates have a maximum 99%relative humidity level measurement. <br /> c. If the vapor drive exceeds 99%relative humidity or 201bs/1,000 sf/24 hrs then the Owner <br /> and/or Engineer shall be notified and advised of additional cost for the possible installation of <br /> a vapor mitigation system that has been approved by the manufacturer or other means to lower <br /> the value to the acceptable limit. <br /> 3. Mechanical surface preparation <br /> a. Shot blast all surfaces to receive flooring system with a mobile steel shot, dust recycling <br /> machine(Blastrac or equal). All surface and embedded accumulations of paint,toppings <br /> hardened concrete layers, laitance,power trowel finishes and other similar surface <br /> characteristics shall be completely removed leaving a bare concrete surface having a <br /> minimum profile of CSP 4-5 as described by the International Concrete Repair Institute. <br />
The URL can be used to link to this page
Your browser does not support the video tag.