Browse
Search
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 1:37:41 PM
Creation date
2/9/2021 12:21:45 PM
Metadata
Fields
Template:
Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: D561B1AE-DF34-4907-AD06-AOEB37BBE427 <br /> CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12, 2020 <br /> 308 WEST FRANKLIN,CHAPEL HILL,NC <br /> 6 Lay tile from center marks established with principal walls,discounting minor offsets,so that <br /> tile at opposite edges of room area of equal width. Adjust as necessary to avoid use of cut <br /> widths less than 1/2 the at room perimeters. <br /> 8 Cut tile neatly around all fixtures. Broken, cracked, chipped, or deformed tiles are not <br /> acceptable. <br /> 9 Lay tile with grain running in one direction or checker board. Color and pattern selection to <br /> be by Architect. <br /> 10 Color and/or texture variation within a contiguous space will not be accepted. Care should <br /> be exercised to match color and texture of tiles in each space. <br /> 11 Apply wall base to walls, columns, pilasters, casework and other permanent fixtures in <br /> rooms or areas where base is required. Install base in lengths as long as practicable,with <br /> preformed corner units, or fabricated from base materials with metered or coped inside <br /> corners. Tightly bond base to substrate throughout length of each piece,with continuous <br /> contact at horizontal and vertical surfaces. <br /> 12 On masonry surfaces,or other similar irregular substrates,fill voids along tip edge of rubber <br /> wall base with manufacturer's recommended adhesive filler material. <br /> 13 Remove any excess adhesive or other surface blemishes, using neutral type cleaners as <br /> recommended by flooring manufacturer. Protect installed flooring with heavy Kraft paper or <br /> other covering. <br /> 14 The contractor shall be responsible for protecting the finished resilient flooring against all <br /> damage from subsequent work. If damage to the finished floor should occur,the Contractor <br /> is responsible for removing damaged resilient flooring and replacing it with perfect resilient <br /> flooring. <br /> 15 After completion of project and just prior to final inspection of work,thoroughly clean floors <br /> and accessories. <br /> 16 Provide Owner with 5% of each type and color of vinyl composition tile installed. <br /> END OF SECTION <br /> 09650- Resilient Flooring-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.