Browse
Search
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 1:37:41 PM
Creation date
2/9/2021 12:21:45 PM
Metadata
Fields
Template:
Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: D561B1AE-DF34-4907-AD06-AOEB37BBE427 <br /> CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12, 2020 <br /> 308 WEST FRANKLIN,CHAPEL HILL,NC <br /> 2 Submit samples showing full range of styles,colors and patterns of resilient tile flooring and <br /> accessories to the Architect for selection. Do not proceed with ordering until selection by the <br /> Architect has been made. <br /> 3 Submit 4 copies of the manufacturer's written recommended maintenance instructions. <br /> 09650-05 PRODUCTS <br /> 1 Luxury Vinyl tile to be delivered in a clearly marked container and to be stored away from <br /> heat and water. Damaged tile will not be accepted and should not be incorporated in the <br /> work. <br /> 2 Luxury Vinyl product to be 4" plank style, greater than 34% solid vinyl content. Plank <br /> product by Armstrong Commercial Flooring or Mohawk Flooring products. <br /> 3 Concrete slab primer, where used, to be non-staining type as recommended by flooring <br /> manufacturer. <br /> 4 Leveling compound to be latex type as recommended by flooring manufacturer. <br /> 5 Rubber base to be 1/8"thick and 4"high as noted in schedule. Rubber base to conform with <br /> Federal Specification SS-W-40a, Type I. <br /> 09650-06 EXECUTION <br /> 1 The Contractor shall verify that all substrate is in acceptable condition prior to installing any <br /> resilient flooring. Surface shall be smooth and free from holes, cracks and other <br /> irregularities and shall be free of paints and other materials that may affect bonding. <br /> Installation assumes responsibility of an acceptable substrate. <br /> 2 Slabs must cure for a minimum of one (1) month before resilient flooring work may <br /> commence. <br /> 3 Slabs-on-grade to receive a latex underlayment as recommended by the tile manufacturer. <br /> 4 Use only the tile adhesive recommended by the tile manufacturer for this specific type of <br /> installation. <br /> 5 Tile to be installed in strict accordance with the recommended installation procedure of the <br /> manufacturer. A copy of such procedure to be delivered to the Architect prior to <br /> commencing the work. Tile to be set even and true with the walls of each room. Joints to be <br /> parallel with or 900 to each enclosing wall. Tile to be laid even with no waves or <br /> imperfections;joints must be flat. No mastic to bubble through joints and the finished floor <br /> to be rendered clean and serviceable at the finish of the work. <br /> 09650- Resilient Flooring-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.