Browse
Search
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 1:37:41 PM
Creation date
2/9/2021 12:21:45 PM
Metadata
Fields
Template:
Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:D561B1AE-DF34-4907-AD06-AOEB37BBE427 <br /> CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12,2020 <br /> 308 WEST FRANKLIN,CHAPEL HILL,NC <br /> C. Forest Certification: Provide wood flooring produced from wood obtained from forests <br /> certified by an FSC-accredited certification body to comply with FSC STD-01-001, "FSC <br /> Principles and Criteria for Forest Stewardship." <br /> D. Hardwood Flooring: Comply with NOFMA's "Official Flooring Grading Rules" for species, <br /> grade, and cut. <br /> 1. Certification: Provide flooring that carries NOFMA grade stamp on each bundle or <br /> piece. <br /> 2. Certification: Provide flooring that carries MFMA mark on each bundle or piece. <br /> E. Mockups: Install mockups to verify selections made under sample submittals and to <br /> demonstrate aesthetic effects and set quality standards for materials and execution. <br /> 1. To set quality standards for installation, install mockup of floor area as shown on <br /> Drawings. <br /> 2. Approved mockups may become part of the completed Work if undisturbed at time of <br /> Substantial Completion. <br /> 1.5 DELIVERY, STORAGE,AND HANDLING <br /> A. Deliver wood flooring materials in unopened cartons or bundles. <br /> B. Protect wood flooring from exposure to moisture. Do not deliver wood flooring until after <br /> concrete,masonry,plaster, ceramic tile, and similar wet work is complete and dry. <br /> C. Store wood flooring materials in a dry,warm,ventilated,weathertight location. <br /> 1.6 PROJECT CONDITIONS <br /> A. Conditioning period begins not less than seven days before wood flooring installation, is <br /> continuous through installation, and continues not less than seven days after wood flooring <br /> installation. <br /> 1. Environmental Conditioning: Maintain an ambient temperature between 65 and 75 deg F <br /> (18 and 24 deg C) and relative humidity planned for building occupants in spaces to <br /> receive wood flooring during the conditioning period. <br /> 2. Wood Flooring Conditioning: Move wood flooring into spaces where it will be installed, <br /> no later than the beginning of the conditioning period. <br /> a. Do not install flooring until it adjusts to relative humidity of, and is at same <br /> temperature as, space where it is to be installed. <br /> b. Open sealed packages to allow wood flooring to acclimatize immediately on <br /> moving flooring into spaces in which it will be installed. <br /> B. After conditioning period, maintain relative humidity and ambient temperature planned for <br /> building occupants. <br /> WOOD FLOORING 096400 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.