Browse
Search
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 1:37:41 PM
Creation date
2/9/2021 12:21:45 PM
Metadata
Fields
Template:
Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:D561B1AE-DF34-4907-AD06-AOEB37BBE427 <br /> CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12, 2020 <br /> 308 WEST FRANKLIN,CHAPEL HILL,NC <br /> 2.8 MISCELLANEOUS MATERIALS <br /> A. Trowelable Underlayments and Patching Compounds: Latex-modified, portland cement-based <br /> formulation provided or approved by manufacturer of tile-setting materials for installations <br /> indicated. <br /> B. Metal Edge Strips: Angle or L-shape, height to match tile and setting-bed thickness, metallic or <br /> combination of metal and PVC or neoprene base, designed specifically for flooring <br /> applications; stainless-steel, ASTM A 666, 300 Series exposed-edge material. Apply as <br /> scheduled and/or shown on the drawings. <br /> C. Tile Cleaner: A neutral cleaner capable of removing soil and residue without harming tile and <br /> grout surfaces, specifically approved for materials and installations indicated by tile and grout <br /> manufacturers. <br /> 2.9 MIXING MORTARS AND GROUT <br /> A. Mix mortars and grouts to comply with referenced standards and mortar and grout manufacturers' <br /> written instructions. <br /> B. Add materials,water, and additives in accurate proportions. <br /> C. Obtain and use type of mixing equipment,mixer speeds, mixing containers,mixing time, and other <br /> procedures to produce mortars and grouts of uniform quality with optimum performance <br /> characteristics for installations indicated. <br /> PART 3 -EXECUTION <br /> 3.1 EXAMINATION <br /> A. Examine substrates, areas, and conditions where tile will be installed, with Installer present, for <br /> compliance with requirements for installation tolerances and other conditions affecting <br /> performance of installed tile. <br /> 1> Verify that substrates for setting tile are firm, dry, clean, free of coatings that are <br /> incompatible with tile-setting materials including curing compounds and other substances <br /> that contain soap, wax, oil, or silicone; and comply with flatness tolerances required by <br /> ANSI A108.01 for installations indicated. <br /> 2> Verify that concrete substrates for tile floors installed with bonded mortar bed or thin-set <br /> mortar comply with surface finish requirements in ANSI A108.01 for installations <br /> indicated. <br /> a. Verify that surfaces that received a steel trowel finish have been mechanically <br /> scarified. <br /> b. Verify that protrusions, bumps, and ridges have been removed by sanding or <br /> grinding. <br /> TILING 093000 - 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.