Browse
Search
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 1:37:41 PM
Creation date
2/9/2021 12:21:45 PM
Metadata
Fields
Template:
Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:D561B1AE-DF34-4907-AD06-AOEB37BBE427 <br /> CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12, 2020 <br /> 308 WEST FRANKLIN,CHAPEL HILL,NC <br /> B. Samples for Initial Selection: For each type of tile and grout indicated. Include Samples of <br /> accessories involving color selection. Provide six (6) copies of all samples and include these <br /> shop drawings on the shop drawing schedule referenced in Division 1. <br /> C. Qualification Data: For qualified Installer. <br /> D. Master Grade Certificates: For each shipment, type, and composition of tile, signed by tile <br /> manufacturer and Installer. <br /> E. Product Certificates: For each type of product, signed by product manufacturer. <br /> F. Material Test Reports: For each tile-setting and-grouting product and special purpose tile. <br /> 1.6 QUALITY ASSURANCE <br /> A. Source Limitations for Tile: Obtain tile of each type and color or finish from one source or <br /> producer. <br /> 1> Obtain tile of each type and color or finish from same production run and of consistent <br /> quality in appearance and physical properties for each contiguous area. <br /> B. Source Limitations for Setting and Grouting Materials: Obtain ingredients of a uniform quality for <br /> each mortar, adhesive, and grout component from one manufacturer and each aggregate from <br /> one source or producer. <br /> C. Source Limitations for Other Products: Obtain each of the following products specified in this <br /> Section from a single manufacturer for each product: <br /> 1> Waterproof membrane. <br /> 2> Crack isolation membrane. <br /> 3> Joint sealants. <br /> 4> Cementitious backer units. <br /> 5> Metal edge strips. <br /> 1.7 DELIVERY, STORAGE,AND HANDLING <br /> A. Deliver and store packaged materials in original containers with seals unbroken and labels intact <br /> until time of use. Comply with requirements in ANSI A137.1 for labeling tile packages. <br /> B. Store tile and cementitious materials on elevated platforms,under cover, and in a dry location. <br /> C. Store aggregates where grading and other required characteristics can be maintained and <br /> contamination can be avoided. <br /> D. Store liquid materials in unopened containers and protected from freezing. <br /> TILING 093000 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.