Orange County NC Website
DocuSign Envelope ID:D561B1AE-DF34-4907-AD06-AOEB37BBE427 <br /> CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12,2020 <br /> 308 WEST FRANKLIN,CHAPEL HILL,NC <br /> Contractor, and Architect, conference participants shall also include Installer's Architectural Hardware <br /> Consultant and Owner's security consultant. Incorporate keying conference decisions into final keying <br /> schedule after reviewing door hardware keying system including,but not limited to,the following: <br /> 1. Function of building, flow of traffic, purpose of each area, degree of security required, and plans <br /> for future expansion. <br /> 2. Preliminary key system schematic diagram. <br /> 3. Requirements for key control system. <br /> 4. Address for delivery of keys. <br /> 1.6 DELIVERY, STORAGE,AND HANDLING <br /> A. Inventory door hardware on receipt and provide secure lock-up for door hardware delivered to Project <br /> site. <br /> B. Tag each item or package separately with identification related to the final door hardware sets, and <br /> include basic installation instructions,templates, and necessary fasteners with each item or package. <br /> C. Deliver keys to manufacturer of key control system for subsequent delivery to Owner. <br /> D. Deliver keys and permanent cores to Owner by registered mail or overnight package service. <br /> 1. Name and address of Owner's representative to be determined. <br /> 1.7 COORDINATION <br /> A. Templates: Distribute door hardware templates for doors, frames, and other work specified to be <br /> factory prepared for installing door hardware. Check Shop Drawings of other work to confirm that <br /> adequate provisions are made for locating and installing door hardware to comply with indicated <br /> requirements. <br /> B. Electrical System Roughing-in: Coordinate layout and installation of electrified door hardware with <br /> connections to power supplies, fire alarm system and detection devices, access control system, security <br /> system,building control system. <br /> 1.8 WARRANTY <br /> A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace <br /> components of door hardware that fail in materials or workmanship within specified warranty period. <br /> 1. Failures include,but are not limited to,the following: <br /> a. Structural failures including excessive deflection, cracking,or breakage. <br /> b. Faulty operation of operators and door hardware. <br /> C. Deterioration of metals, metal finishes, and other materials beyond normal weathering and <br /> use. <br /> 2. Warranty Period: Three years from date of Substantial Completion, except as follows: <br /> DOOR HARDWARE 087100 -4 <br />