Browse
Search
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 1:37:41 PM
Creation date
2/9/2021 12:21:45 PM
Metadata
Fields
Template:
Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:D561B1AE-DF34-4907-AD06-AOEB37BBE427 <br /> CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12,2020 <br /> 308 WEST FRANKLIN,CHAPEL HILL,NC <br /> 5) Location of each door hardware set, cross-referenced to Drawings, both on floor <br /> plans and in door and frame schedule. <br /> 6) Explanation of abbreviations, symbols,and codes contained in schedule. <br /> 7) Mounting locations for door hardware. <br /> 8) Door and frame sizes and materials. <br /> 9) Description of each electrified door hardware function, including location, sequence <br /> of operation, and interface with other building control systems. <br /> a) Sequence of Operation: Include description of component functions that <br /> occur in the following situations: authorized person wants to enter; <br /> authorized person wants to exit; unauthorized person wants to enter; <br /> unauthorized person wants to exit. <br /> 10) List of related door devices specified in other Sections for each door and frame. <br /> d. Submittal Sequence: Submit the final door hardware sets at earliest possible date, <br /> particularly where approval of the door hardware sets must precede fabrication of other <br /> work that is critical in Project construction schedule. Include Product Data, Samples, Shop <br /> Drawings of other work affected by door hardware, and other information essential to the <br /> coordinated review of the door hardware sets. <br /> e. Submittal Sequence: Submit initial draft of final schedule along with essential Product <br /> Data to facilitate the fabrication of other work that is critical in Project construction <br /> schedule. Submit the final door hardware sets after Samples, Product Data, coordination <br /> with Shop Drawings of other work, delivery schedules, and similar information has been <br /> completed and accepted. <br /> 2. Keying Schedule: Prepared by or under the supervision of Architectural Hardware Consultant, <br /> detailing Owner's final keying instructions for locks. Include schematic keying diagram and <br /> index each key set to unique door designations. <br /> 1.5 QUALITY ASSURANCE <br /> A. Installer Qualifications: An employer of workers trained and approved by lock manufacturer. <br /> 1. Installer's responsibilities include supplying and installing door hardware and providing a <br /> qualified Architectural Hardware Consultant available during the course of the Work to consult <br /> with Contractor,Architect, and Owner about door hardware and keying. <br /> 2. Installer shall have warehousing facilities in Project's vicinity. <br /> 3. Scheduling Responsibility: Preparation of door hardware and keying schedules. <br /> 4. Engineering Responsibility: Preparation of data for electrified door hardware, including Shop <br /> Drawings, based on testing and engineering analysis of manufacturer's standard units in <br /> assemblies similar to those indicated for this Project. <br /> B. Architectural Hardware Consultant Qualifications: A person who is currently certified by DHI as an <br /> Architectural Hardware Consultant and who is experienced in providing consulting services for door <br /> hardware installations that are comparable in material, design, and extent to that indicated for this <br /> Project. <br /> C. Keying Conference: Conduct conference at Project site to comply with requirements in Division 01 <br /> Section "Project Management and Coordination." In addition to Owner, Construction Manager, <br /> DOOR HARDWARE 087100 - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.