Browse
Search
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 1:37:41 PM
Creation date
2/9/2021 12:21:45 PM
Metadata
Fields
Template:
Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:D561B1AE-DF34-4907-AD06-AOEB37BBE427 <br /> CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12,2020 <br /> 308 WEST FRANKLIN,CHAPEL HILL,NC <br /> 1.4 SUBMITTALS <br /> A. Product Data: Include construction and installation details, material descriptions, dimensions of <br /> individual components and profiles, and finishes. <br /> B. Samples for Initial Selection: For each finish, color, and texture required for each type of door <br /> hardware indicated. <br /> C. Samples for Verification: Submit minimum 2-by-4-inch(51-by-102-mm)plate Samples of each type of <br /> finish required, except primed finish. <br /> D. Samples for Verification: For exposed door hardware of each type, in specified finish, full size. Tag <br /> with full description for coordination with the door hardware sets. Submit Samples before, or <br /> concurrent with, submission of the final door hardware sets. <br /> 1. Samples will be returned to Contractor. Units that are acceptable and remain undamaged through <br /> submittal, review, and field comparison process may, after final check of operation, be <br /> incorporated into the Work,within limitations of keying requirements. <br /> E. Qualification Data: For installer. <br /> F. Product Test Reports: Based on evaluation of comprehensive tests performed by manufacturer and <br /> witnessed by a qualified testing agency, for locks, latches, delayed-egress locks, and closers. <br /> G. Maintenance Data: For each type of door hardware to include in maintenance manuals. Include final <br /> hardware and keying schedule. <br /> H. Warranty: Special warranty specified in this Section. <br /> I. Other Action Submittals: <br /> 1. Door Hardware Sets: Prepared by or under the supervision of Architectural Hardware <br /> Consultant, detailing fabrication and assembly of door hardware, as well as procedures and <br /> diagrams. Coordinate the final door hardware sets with doors, frames, and related work to ensure <br /> proper size,thickness,hand, function, and finish of door hardware. <br /> a. Format: Comply with scheduling sequence and vertical format in DHI's "Sequence and <br /> Format for the Hardware Schedule." Double space entries, and number and date each <br /> page. <br /> b. Format: Use same scheduling sequence and format and use same door numbers as in the <br /> Contract Documents. <br /> C. Content: Include the following information: <br /> 1) Identification number, location, hand, fire rating, and material of each door and <br /> frame. <br /> 2) Type, style, function, size, quantity, and finish of each door hardware item. Include <br /> description and function of each lockset and exit device. <br /> 3) Complete designations of every item required for each door or opening including <br /> name and manufacturer. <br /> 4) Fastenings and other pertinent information. <br /> DOOR HARDWARE 087100 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.