Browse
Search
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 1:37:41 PM
Creation date
2/9/2021 12:21:45 PM
Metadata
Fields
Template:
Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:D561B1AE-DF34-4907-AD06-AOEB37BBE427 <br /> CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12,2020 <br /> 308 WEST FRANKLIN,CHAPEL HILL,NC <br /> SECTION 087100-DOOR HARDWARE <br /> PART 1 - GENERAL <br /> 1.1 RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and <br /> Division 01 Specification Sections, apply to this Section. <br /> 1.2 SUMMARY <br /> A. This Section includes the following: <br /> 1. Commercial door hardware for the following: <br /> a. Swinging doors. <br /> b. Non-fire-rated folding doors. <br /> C. Doors to the exterior. <br /> d. Other doors to the extent indicated. <br /> B. Related Sections include the following: <br /> 1. Division 08 Section "Hollow Metal Doors and Frames" for astragals provided as part of fire-rated <br /> labeled assemblies and door silencers. <br /> 2. See Door Hardware Allowance. <br /> 1.3 DOOR HARDWARE ALLOWANCE <br /> A. Door Hardware Selection: Furnish door hardware selected by Architect, in quantities specified in this <br /> Section and in Division 01 Section "Allowances." <br /> B. Allowance Bidding: After Architect selects door hardware and issues the door hardware sets, request <br /> bids for products and materials. <br /> C. Allowance Award: Architect will select bid from bids furnished by Contractor. Award purchase order <br /> to bidder selected. <br /> D. Allowance Adjustment: A Change Order will be issued to adjust difference between door hardware <br /> allowance and selected bid from door hardware Installer. <br /> E. Installation: General types and approximate quantities of door hardware are indicated in the list of door <br /> hardware sets to provide a basis for the cost of installation and other Work that is part of the Contract <br /> Sum but not included in door hardware allowance. <br /> DOOR HARDWARE 087100 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.