Browse
Search
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 1:37:41 PM
Creation date
2/9/2021 12:21:45 PM
Metadata
Fields
Template:
Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:D561B1AE-DF34-4907-AD06-AOEB37BBE427 <br /> CHAPEL HILL ORANGE COUNTY VISITORS BUREAU August 12,2020 <br /> 308 WEST FRANKLIN,CHAPEL HILL,NC <br /> 1. Fabricate door and transom panels with full-width, solid-lumber[,rabbeted,] meeting <br /> rails. Provide factory-installed spring bolts for concealed attachment into jambs of metal <br /> door frames. <br /> D. Openings: Cut and trim openings through doors in factory. <br /> 1. Light Openings: Trim openings with moldings of material and profile indicated. <br /> 2. Glazing: Factory install tempered frosted glazing in door indicated as glazed. <br /> 3. Louvers: Factory install louvers in prepared openings. <br /> 2.5 FACTORY FINISHING <br /> A. General: Comply with referenced quality standard for factory finishing. Complete fabrication, <br /> including fitting doors for openings and machining for hardware that is not surface applied, <br /> before finishing. <br /> 1. Finish faces, all four edges, edges of cutouts, and mortises. Stains and fillers may be <br /> omitted on edges of cutouts, and mortises. <br /> B. Finish doors at factory. <br /> C. Finish doors at factory that are indicated to receive transparent finish. Field finish doors <br /> indicated to receive opaque finish. <br /> D. Finish doors at factory where indicated in schedules or on Drawings as factory finished. <br /> E. Transparent Finish: <br /> 1. Grade: Custom. <br /> 2. Finish: catalyzed polyurethane system. <br /> 3. Finish: TR-6 catalyzed polyurethane. <br /> 4. Staining: As selected by Architect from manufacturer's full range. <br /> 5. Effect: Open-grain finish. <br /> 6. Sheen: Satin. <br /> PART 3 -EXECUTION <br /> 3.1 EXAMINATION <br /> A. Examine doors and installed door frames before hanging doors. <br /> 1. Verify that frames comply with indicated requirements for type, size, location, and swing <br /> characteristics and have been installed with level heads and plumb jambs. <br /> 2. Reject doors with defects. <br /> B. Proceed with installation only after unsatisfactory conditions have been corrected. <br /> WOOD DOORS 081416 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.