Browse
Search
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2021
>
2021-058-E AMS-Racanelli Construction South 308 Franklin Street upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 1:37:41 PM
Creation date
2/9/2021 12:21:45 PM
Metadata
Fields
Template:
Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: D561B1AE-DF34-4907-AD06-AOEB37BBE427 G <br /> j <br /> 1.5 ACKNOWLEDGEMENT OF ADDENDA <br /> A. The undersigned Bidder acknowledges receipt of and use of the following Addenda in the <br /> preparation of this Bid: <br /> k. <br /> 1 Addendum No. 1,dated September 3,2020 <br /> 2 Addendum No. 2,dated Gj t <br /> 3 Addendum No. 3,dated <br /> 4 Addendum No.4,dated <br /> 5 Addendum No. 5,dated <br /> 6 Addendum No. 6,dated <br /> I <br /> 1.6 ALTERNATES <br /> A. The undersigned Bidder proposes the amount below be added to or deducted from the Base Bid if <br /> particular alternates are accepted by Owner.Amounts listed for each alternate include costs of related <br /> coordination,modification, or adjustment. <br /> B. If the alternate does not affect the Contract Sum,the Bidder shall indicate "NO CHANGE." <br /> C. If the alternate does not affect the Work of this Contract,the Bidder shall indicate"NOT <br /> APPLICABLE." <br /> D. The Bidder shall be responsible for determining from the Contract Documents the effects of each <br /> alternate on the Contract Time and the Contract Sum. <br /> E. Owner reserves the right to accept or reject any alternate,in any order,and to award or amend the <br /> Contract accordingly within 30 days of the Notice of Award unless otherwise indicated in the k <br /> Contract Documents. <br /> F. Acceptance or non-acceptance of any alternates by the Owner shall have no effect on the Contract Time <br /> unless the"Schedule of Alternates"Article below provides a formatted space for the adjustment of the <br /> Contract Time. <br /> G. Alternates: <br /> 1. Alternate No. 1: Indicate cost increase to provide and install Resinous Flooring where <br /> indicated in the specifications and on the plans <br /> a. D {� DEDUCT NO <br /> CHANGE <br /> �NT <br /> LICABLE� o ($ D <br /> c.ADD DEDUCT calendar days to adjust the C tract Time for this alternate. j <br /> CONTRACTOR'S LICENSE <br /> A. The undersigned further states that it is a duly licensed contractor,for the type of work proposed,in Orange <br /> County North Carolina. <br />
The URL can be used to link to this page
Your browser does not support the video tag.